Estimating Project Management and Operations

12 of 12 modules published. Each module is four lessons, a question bank and a practical task.

  1. 4 lessons · about 55 min

    Project lifecycle and contract documents

    The steps of a flashing job and who signs with whom, what counts as a contract document and what outranks what, how submittals, payments and notices are timed, and how to read a bid set and keep a record that holds up.

  2. 4 lessons · about 50 min

    Scope identification, inclusions and exclusions

    What a scope is, where a flashing scope is written across drawings and specification sections, an eight-step review that records what was not found, and how to write and check inclusions, exclusions and clarifications.

  3. 4 lessons · about 46 min

    Material takeoffs and quantity reconciliation

    How a drawing set and schedule become runs, pieces, strips, sheets, pounds and accessory counts, what fixes those numbers, a nine-step worked example, and the checks that find a defect before it reaches the shop.

  4. 4 lessons · about 39 min

    Fabrication labor and machine time estimating

    Hours of people, hours of machine and elapsed days; GAO's estimating methods and the build-up of an operation list from bends, hems, girth and pieces; AFS's limits, wages as BLS reports them, learning curves, and how to check an estimate before it leaves the desk.

  5. 4 lessons · about 55 min

    Installation labor and productivity estimating

    How an installer turns a quantity and a production rate into labor-hours, crew-days and a manpower plan, what moves a rate, how published overtime and crew-size multipliers are read, and how to check planned hours against actual.

  6. 4 lessons · about 44 min

    Procurement, supplier qualification and logistics

    How metal is qualified, bought, moved and received: the paperwork, who bears the loss in transit, sheet weights, tiedown minimums for a load, and what to do when a bundle arrives wet.

  7. 4 lessons · about 44 min

    Production planning and delivery coordination

    How an order moves from approved submittal to a delivered bundle: the planning terms and the AFS shop queue, piece limits, weight and storage rules, backward scheduling with the next-business-day booking, and the checks that catch late, wrong or damaged deliveries.

  8. 4 lessons · about 49 min

    Construction scheduling and trade interfaces

    How flashing work fits a construction schedule: critical path, float and hand-offs between trades, a method for sequencing and inspecting an interface, and how interface failures are read and recorded.

  9. 4 lessons · about 55 min

    RFIs, change orders and document control

    What an RFI asks and what only a signed change can do, the clocks and limits that bind a change, how to write, log and carry a revision through quote, drawing and shop, and the checks that catch a stale or unapproved change.

  10. 4 lessons · about 48 min

    Field quality plans and inspection records

    How a written field quality plan for flashing is built: the feature of work it controls, the preparatory, initial and follow-up phases, the thickness and size checks, the deficiency list and the records a reviewer reads, with the fall-protection rule for roof inspection.

  11. 4 lessons · about 53 min

    Cost tracking, productivity and profitability

    What a job cost is made of, how strips per sheet, hems and piece length drive a flashing job, and how to compare actual hours and material with a baseline. Covers earned value, percent complete, margin versus markup and the checks that make the numbers trustworthy.

  12. 4 lessons · about 79 min

    Closeout, punch lists and warranties

    How a project is closed out: substantial and final completion, a punch list that can be closed, the closeout package, and how warranties are issued, kept in force and claimed on.