Ten scope defects tied to the sources, a second-reader checklist and the evidence to file, a constructed case study of a cleat nobody carried, and the options for closing a found gap.

You will be able to: Recognize the common ways a scope goes wrong, run a second-reader check, walk a constructed case study to the written question that closes the gap, and say which corrective options the contract may allow.

10 min · 10 slides · 7 questions

All lessons in this module
Slide 1 of 10

Ten ways a scope goes wrong

Omission: nobody carries the item. Overlap: two parties do. Vague wording. A boilerplate exclusion. Conflicting documents. A missing addendum. An unstated assumption. A thickness the table does not give. An item beyond AFS’s limits. A flashing family split across sections with no one joining the halves.

Sources

Glossary

Double scoped
Work that appears in the scope of more than one trade. ASAMW says caulking is often double scoped across multiple trades.
Scope gap
Required work that no party’s price or subcontract includes. A working term used in this module.
Bid leveling
Putting competing proposals on the same scope basis before comparing them (this module’s working definition). ASAMW asks both sides to review exclusions in detail during bid and leveling.
Deviation
A bid that departs from the specified material or basis of design. ASAMW says a bidder must clearly highlight deviations in its proposal.
Boilerplate exclusion
A standard list of exclusions carried on every bid instead of identifying what the project does not require. ASAMW reports it as a recurring complaint.
Second reader
A person who did not write the scope and checks its words against a checklist before the price is set. A working practice taught in this module.