Ten ways a scope goes wrong
Omission: nobody carries the item. Overlap: two parties do. Vague wording. A boilerplate exclusion. Conflicting documents. A missing addendum. An unstated assumption. A thickness the table does not give. An item beyond AFS’s limits. A flashing family split across sections with no one joining the halves.
Sources
- Scope Best Practices and Specificity (June 2025) - American Subcontractors Association of Metro Washington
- UFGS-07 60 00 Flashing and Sheet Metal (August 2023, Change 1 05/25) - USACE, NAVFAC and AFCEC, hosted by the Whole Building Design Guide
- AFS fabrication limits - materials, thicknesses, bend rules and sizes the shop can make - Architectural Flashing Supply