Architectural Flashing Supply
Start a Quote
4¼"½" hemCounterflashing · drag to turnReglet lip, 4¼" face, 45° kick, 1/2" open hem turned in. Regal Blue Kynar 500 outside (color shown approximate), Galvalume behind.
Greater Austin · Austin, Texas

Edge metal, coping and flashing for Austin's commercial jobs

ES-1 edge, coping, through-wall flashing and scuppers, built to your spec section and shop drawings in our Burnet shop. Delivered to Austin jobsites, shipped nationwide.

What AFS does

Spec section to jobsite, one shop

Takeoffs, submittals, fabrication and delivery by the same people, so what the architect approved is what lands on the roof.

Tested edge metal

ES-1 tested edge systems

Drexel Metals fascia, gravel stop and coping, fabricated under Drexel's ES-1 program and tested to ANSI/SPRI/FM 4435 ES-1. Test documentation goes in your submittal.

ANSI/SPRI/FM 4435FasciaGravel stopCopingEdge wind-load calculator →
The core

Custom fabrication

Profiles bent to your exact dimensions in the metal, gauge and finish you specify: coping, edge metal, through-wall flashing, scuppers and collector heads, counterflashing and trim.

Touchscreen control panel on the AFS shop's sheet-metal folder showing a grid of saved flashing profiles, an operator's finger on the screen and a red emergency stop button below
Programming a profile at the Burnet shop
Hems, kicks, end damsLabeled by elevation
See the service →

Submittals

Shop drawings, product data, finish samples and ES-1 documentation for review.
AFS's red trailer-mounted roll former, branded AFS Architectural Flashing Supply, with forming rollers along its side and two coils of sheet metal on the rear stands, parked on a street
On-site roll formingWe bring the roll former to the jobThe AFS roll former travels on its own trailer and forms panels and profiles to length at your Austin jobsite, so long runs aren't limited to what fits on a truck.The AFS roll former

Estimating & takeoffs

Quantities by profile and finish, measured from your bid set.

Design & spec support

Details, finishes and spec-section language, concept to final.

Delivery & tracking

Delivered to your Austin jobsite, or shipped nationwide, tracked once it leaves.
Field App · Photo to Quote

The edge doesn't match the drawings? Photograph it.

For PMs and supers on commercial re-roofs, renovations and finish-outs: the existing coping or gravel stop is rarely what the as-builts show, if there are as-builts. Photograph the piece with one tape measurement from the roof. We draw it in FlashDraft and confirm every dimension with you before it's bent.

  1. 1Photograph itThe existing coping, edge or flashing, with one measured dimension.
  2. 2We draw the profileDrawn in FlashDraft, every dimension confirmed with you.
  3. 3Formed and deliveredBent in our Burnet shop and delivered to your Austin jobsite.
Working in Austin

What the job here changes about the metal

Three things drive the sheet metal on Austin commercial work. Here's what each means for the flashing, and the fastest way to get it made.

The condition

Low-slope edges must meet ES-1

ANSI/SPRI/FM 4435 ES-1 is the wind design standard for edge systems on low-slope roofs, and it's written into the International Building Code. On a low-slope roof, the edge and coping have to answer to it.

Confirm the code edition that applies to your permit with Austin Development Services.
What it means for the metal
  • Fascia, gravel stop and coping from a tested system: Drexel ES-1, built to its tested gauge, cleat and fastener spacing.
  • ES-1 test documentation in the submittal, so the reviewer isn't chasing it.
  • Edge loads checked for the building height and exposure before you order.
Spec-to-submittal desk · for architects and GCs

Pick the job and scope. See the package before you send the spec.

  1. 1Project type
  2. 2Scope
  3. 3Package
  4. 4Upload
1 · Project type
2 · Edge, coping and flashing scope

Spec sections: 07 71 00

3 · Your submittal package

Commercial low-slope · 2 scopes
  1. 1Shop drawingsOne dimensioned sheet per profile: es-1 edge & gravel stop, coping. Gauge, metal and finish called out.Included
  2. 2Product dataData sheets for the metal and the Kynar 500 finish.Included
  3. 3Finish samplesColor chips from the finish line you specify.Included
  4. 4ES-1 test documentationFor Drexel Metals edge and coping systems: ANSI/SPRI/FM 4435 ES-1 results for the system specified.Drexel systems
4 · Upload through Scan to QuoteDrop the spec section and roof sheetsSection 07 71 00 plus edge and parapet details. PDF, DWG, DXF or IFC. Your project type and scope go with the upload.Upload to Scan to Quote
The condition

A commercial pipeline in every corridor

State filings show multifamily, shell, retail, warehouse and airport work registered from the Domain to AUS. Every one needs edge metal and flashing on the roofer's schedule.

North$36.1MSt. John North3 multifamily buildings + clubhouse · Jun 2026 – Jul 2028 · design: L-A-N-DBidding this? Send plans →TABS2026021032
East$30.0MPathways at Santa Rita Courts East4-story, 77 units + 11 historic buildings · Nov 2026 – Jun 2028 · design: NelsenBidding this? Send plans →TABS2026015582
Southwest$19.3MTarget T-2981, 13786 W US 290New commercial building, Hays County · Feb 2027 – Jan 2028 · design: RSP ArchitectsBidding this? Send plans →TABS2026019443
North$7.0MDomain 9.5, 11815 Alterra Pkwy31,410 SF 2-story shell + garage · Jun 2026 – Jun 2027 · design: Chioco DesignBidding this? Send plans →TABS2026015909
East$3.3MBuilding 2, Decker Industrial ParkConcrete tilt warehouse · Feb 2026 – Feb 2027 · design: GMA ArchitectsBidding this? Send plans →TABS2026008648
Airport$2.3MAUS terminal restaurant (Pink Tattoo)Gate area renovation · Sep 2026 – Jan 2027 · design: Dick Clark + AssociatesBidding this? Send plans →TABS2026028870
East$1.1MAutoZone #11378, 6401 E Riverside6,446 SF store, ground up · Apr – Sep 2027 · design: AutoZone DevelopmentBidding this? Send plans →TABS2026025961
Airport$978KSouthwest Airlines West Gates build-out3,900 SF ramp level · Sep 2026 – Jan 2027 · design: Bensaer LLCBidding this? Send plans →TABS2026026138
Public filings, Texas Department of Licensing and Regulation (TABS). AFS is not involved in these projects unless stated. Each card links to its state record.
What it means for the metalTakeoffs from the bid set, a submittal package, and delivery timed to the roofing schedule at the jobsite.Estimating & takeoffs →Delivery & tracking →
The condition

Multifamily, new and historic

The two largest projects on the pipeline board are housing: St. John North, three buildings ($36.1M), and Pathways at Santa Rita Courts East, a four-story building plus 11 historic buildings renovated ($30M).

Source: TDLR TABS2026021032 and TABS2026015582
What it means for the metal
  • Through-wall flashing with end dams at heads, sills and shelf angles, repeated across every unit.
  • Parapet coping and edge on several buildings.
  • On historic renovations, new pieces matched to existing profiles that have no drawings.
Work it out before you call

Big flat roofs move a lot of water

Warehouse, flex-shell and big-box jobs like the ones on the pipeline board usually carry large low-slope roofs, so drainage gets worked out early. Screen the design flow with the Roof Drainage calculator. Once the plumbing designer sizes the outlets and overflow, send them to us and we fabricate the scuppers, collector heads and downspouts.

Example run · sample rainfall12,000 ft² · 4 outlets511.2 gpmtotal127.8 gpmper outlet
Roof Drainage calculator · roof area and rainfall to design flow
  1. 1Roof areaEnter the horizontal projected roof area, plus any wall area that drains onto the roof.
  2. 2Design rainfallEnter the rate your governing code requires for the site. The calculator links to NOAA’s precipitation data to look it up.
  3. 3Outlets and codeEnter the number of outlets, their rated capacity from the manufacturer if you have it, and the code edition you are working to.
  4. 4Design flowGet the design flow in gpm, the flow per outlet and the contributing area. Add it to a submittal, download a spreadsheet or print it.

The calculator is a preliminary screen. Outlet, leader and overflow sizing, ponding and secondary drainage stay with the plumbing designer.

Drawing a profile and adding an open hem
FlashDraft

Detail it yourself in two minutes

A transition the drawings missed, a custom end dam, a coping with a different back leg: draw the legs, bends and hems in your browser, checked against our shop limits as you go. Double-click a leg end for a hem. Send it straight to a quote.

The profile library

All 116 profiles

Open any profile to quote it, or to design from it in FlashDraft before you quote.

Questions

Commercial edge, coping and submittal questions

Straight answers from the people who bend the metal. Don't see yours? Ask the shop.

ANSI/SPRI/FM 4435 ES-1 is the wind design standard for edge systems used with low-slope roofs. It covers how the edge is designed and tested to stay on the building in high wind, and it is referenced by the International Building Code. AFS fabricates Drexel Metals ES-1 edge systems.
Greater Austin

Working outside the city line?

Same shop, same estimators across the metro. Pick a city.

Page comingRound RockQuotes for Round Rock jobs go to the same shop and estimators today.Request a Round Rock quote
Schematic · not to scale
Have an Austin job?

Send the spec. Get a real quote.

Scan to Quote for the bid set, Photo to Quote from the roof, FlashDraft for a single profile, or call the shop.

(512) 372-4900

Ask the shop

A detail, a cleat spacing, a lead time. It goes to the people who bend the metal.