Six ways an estimate goes wrong
Six common ways an estimate goes wrong: an operation left out, setup charged on every piece, a piece or girth over the limit assumed makeable, a thickness rule ignored, a wage used as a loaded cost, and a learning curve applied to a one-off.
Each is found by checking the estimate against the drawing and the registers, not by feel.