Installation labor and productivity estimating · Lesson 4 of 4

Installation labor and productivity estimating: defects, verification and case study

How to compare planned with actual hours using the Delta, a published sheet-metal case study, four common estimating defects, how to verify an estimate while the work runs, and why lost hours are never recovered by dropping protection.

You will be able to: Diagnose a plausible installation estimating defect, check planned hours against actual, and document the evidence for review.

13 min · 10 slides · 13 questions

All lessons in this module
Slide 1 of 10

Planned versus actual: the Delta

Hanna defines Delta as actual labor hours minus the estimated hours including approved change orders. A positive Delta means actual productivity was worse than estimated.

%Delta is Delta divided by the actual hours.

Causes the study names include an inaccurate estimate, contractor inefficiency, change orders, weather and interruptions.

Glossary

Delta
Actual labor hours minus the estimated hours including approved change-order hours. A positive Delta means actual productivity was worse than estimated (Hanna).
Percent Delta
Delta divided by the actual hours, as Hanna defines it.
Work sampling
Recording what a worker is doing at fixed intervals, such as every 60 seconds, to learn the share of time spent on direct work.
Applicability range
The span of inputs a published equation or table was built on, such as 5 to 50 percent overtime. Outside it the figure is not applied.