Where requirements come from
Before work starts the UFGS has the crew review each paragraph of the specification, the referenced codes and standards, and the contract drawings.
UFGS 07 60 00's own note tells the specifier to compare its thicknesses with the NRCA and SMACNA manuals and to edit the tables using the more stringent requirement.
Sources
- UFGS 01 45 00 Quality Control (August 2023, Change 3 - 08/25) - USACE / NAVFAC / AFCEC, hosted by the Whole Building Design Guide (NIBS)
- UFGS 07 60 00 Flashing and Sheet Metal (August 2023, Change 1 - 05/25) - USACE / NAVFAC / AFCEC, hosted by the Whole Building Design Guide (NIBS)