Architectural Flashing Supply
Start a Quote
Marble Falls, Texas

Coping, edge metal and flashing for Marble Falls jobs

The granite's already here. We bend the metal that caps it — formed at our Burnet shop, picked up there or delivered to your site.

Coping cap · drag to turnKynar 500 painted side out (color shown approximate), Galvalume underside, 1/2" open hems turned in.
What AFS does

Takeoff to tailgate, one shop

Estimating, submittals, fabrication and delivery handled by the same people, so nothing gets lost between your plans and your roof.

Field App · Photo to Quote

Odd wall, old coping, no drawings? Photograph it.

Marble Falls stone is rarely a stock width, and the coping you're replacing is usually 20 years past its drawings. Snap the piece or a hand sketch with one tape measurement — we draw it in FlashDraft and confirm every dimension with you.

  1. 1Photograph itThe existing piece, or a hand sketch, with one measured dimension.
  2. 2We draw the profileDrawn in FlashDraft, every dimension confirmed with you.
  3. 3Formed and deliveredBent in Burnet, picked up or delivered to the job.
Working in Marble Falls

What the job here changes about the metal

Three things show up on Marble Falls jobs again and again. Here's what each one means for the flashing, and the fastest way to get it made.

The condition

Granite and stone parapets

Granite Mountain, just northwest of town, supplied the red granite for the Texas Capitol, and a lot of Marble Falls is built of stone. Stone walls wander in width end to end.

Sources: Handbook of Texas, "Granite Mountain"; DailyTrib, Nov 5 2019
What it means for the metal
  • Coping formed to the widths you measure, not a stock size.
  • Counterflashing set into the stone with a reglet, lapping the base flashing.
  • Pieces labeled by wall run, so the crew installs them in order.
The condition

A commercial pipeline on 281 and 1431

State filings show school and bank work underway. Commercial jobs mean edge metal and coping on a schedule, with submittals.

Bidding one of these? Send us the plans
$38.1MMFHS CTE, locker rooms & multi-purposeMarble Falls ISD · filed Jun 2026 · design: HuckabeeQuote the metal →TABS2026022861
$13.8MMFHS auditorium, band & danceMarble Falls ISD · filed Jun 2026 · design: HuckabeeQuote the metal →TABS2026023935
$9.0MFrost Financial Center, 1511 N US 281Jul 2026 – Feb 2027 · design: O'Connell RobertsonQuote the metal →TABS2026018461
Public filings, Texas Department of Licensing and Regulation (TABS). AFS is not involved in these projects unless stated. Each card links to its state record.
What it means for the metalSubmittal packages, ES-1 tested edge systems, and delivery timed to the roofing schedule.Submittals →ES-1 edge metal →
The condition

Hail re-roofs

When a storm comes through, roofers re-roof whole neighborhoods at once — and every re-roof needs new edge metal and flashing.

NOAA Storm Events: 2.75-inch hail in Marble Falls on April 9, 2024 (event 1172088).
For roofers bidding the jobHailView shows dated storm records for that address — useful for scoping the re-roof before you bid it.
What it means for the metalDrip edge, gravel stop, step and counterflashing for every roof on the list — quoted in one batch.Batch-quote a re-roof list →
Roof Edge calculator · coping runs to pieces
Work it out before you call

A stone wall, measured run by run

Granite walls jog, step and turn. Walk the parapet with a tape, then let the Roof Edge calculator turn your runs into a cut list.

  1. 1Pick coping, add each wall run with its length, and mark every corner inside or outside.
  2. 2Set the piece length, splice lap and corner legs, and how each end finishes: end cap or dying into a wall.
  3. 3Get straight pieces, joints, corners, end caps and cleat length, run by run, with short closers flagged.
  4. 4Add it to a submittal, download the spreadsheet, or send it to us for a quote.
FlashDraft

Draw it yourself in two minutes

Legs, bends and hems in your browser, checked against our shop limits as you draw. Double-click a leg end for a hem. Send it straight to a quote.

Drawing a profile and adding an open hem
The profile library

All 116 profiles

6 of 11 shownShow all 116 profiles
Questions

Coping, scupper and edge-metal questions

Straight answers from the people who bend the metal. Don't see yours? Ask the shop.

The parapet is the short wall that rises above the roof edge. The coping is the cap on top of it that sheds water off the wall and protects the top of the masonry. We form metal coping to the measured width of your wall.
Have a Marble Falls job?

Send the plans. Get a real quote.

Scan to Quote for drawings, Photo to Quote from the jobsite, FlashDraft for a single profile — or call the shop.

(512) 372-4900

Ask the shop

A detail, a material, a lead time — it goes to the people who bend the metal.