Six ways it goes wrong
Each failure below is taught from a source in this module:
- RFIs unnumbered, batched or about several subjects (Navigant).
- The answer never reaches the drawings (Navigant).
- Work starts on a verbal answer (University of Michigan).
- Notice arrives late (California courts contract).
- Time is changed on the wrong form (Fort Worth).
- Approval is mistaken for a check (UFGS 01 33 00).
Sources
- Impact & Control of RFIs on Construction Projects (A Research Perspective), April 2013 - Navigant Construction Forum (hosted by CMAA)
- Standard General Conditions applicable to projects where the Owner has retained a Contractor (form date 1 Nov 2016, rev. 2/24) - University of Michigan Facilities and Operations, Architecture Engineering and Construction
- Attachment F, General Conditions of the Agreement for Construction (Document 00 70 00), San Joaquin juvenile justice center, 2013 - Judicial Council of California (Administrative Office of the Courts)
- Construction Change Orders audit, Project #2020.019 (4 March 2022) - City of Fort Worth Department of Internal Audit
- UFGS 01 33 00 Submittal Procedures (August 2026) - USACE, NAVFAC and AFCEC, published through the Whole Building Design Guide