Where the requirements live
No single public text sets closeout rules. They sit in your contract, the Division 01 closeout section, each maker's warranty form and state law.
UFGS 01 78 00 has its warranty management plan cover information relevant to FAR 52.246-21 Warranty of Construction.
UH 01 77 00 is the University of Houston's Closeout Procedures section, one owner's master specification, used here as an example.
Sources
- UFGS 01 78 00 Closeout Submittals (August 2026 edition): record drawing definitions, warranty management plan, warranty tags and the 4-month and 9-month reviews - USACE, NAVFAC and AFCEC, published by the Whole Building Design Guide
- Section 01 77 00 Closeout Procedures, Master Construction Specifications (revision date 29 January 2016) - University of Houston