Architectural Flashing Supply
Start a Quote
Tier 3

Professional Installation

14 of 14 modules published. Each module is four lessons, a question bank and a practical task.

  1. 4 lessons · about 66 min

    Jobsite readiness and hazard controls

    The federal construction rules a flashing crew meets on the roof: edges, holes, warning lines, fall arrest, ladders, power lines, heat and hot work. A documented readiness method with worked examples, then how to spot, fix and record common jobsite defects.

  2. 4 lessons · about 57 min

    Substrates, blocking and attachment

    What edge metal is fastened to and how that wood is anchored, the ED-1 minimums and the treated-wood fastener rules, a field method with worked examples and a maker's installation order, and how to find, fix and record attachment defects.

  3. 4 lessons · about 51 min

    Underlayments, membranes and WRBs

    What roof underlayment, ice barrier membranes and wall water-resistive barriers do and how each laps with the metal, the code rows and product limits that govern them, how they are installed with worked extent and lap checks, and the faults an inspection looks for.

  4. 4 lessons · about 53 min

    Eaves, rakes and drip edge

    What a drip edge does at the eave and the rake, the code, roofing-maker and AFS limits behind it, how a crew sequences and laps the metal with underlayment and ice barrier, with worked examples, and how to inspect and fix the common defects.

  5. 4 lessons · about 43 min

    Parapet coping and cap installation

    How a parapet coping is built up and installed: its layers and parts, the documents and standards that govern it, a step-by-step field method with worked examples, and how to inspect it and trace a leaking joint to its cause.

  6. 4 lessons · about 42 min

    Gravel stops, fascia and edge metal

    How a two-part roof edge goes on in the field: the parts and how each cover engages its cleat, the values Drexel prints, the Gravel Stop sequence with worked layouts, the defects to inspect for, and OSHA's fall-protection rules at the edge.

  7. 4 lessons · about 39 min

    Base flashing, counterflashing and reglets

    How a roof-to-wall joint is installed: base flashing terminated up the wall, counterflashing lapped over it from a reglet or receiver, the documents that set each height, lap and spacing, the silica and fall rules for the crew, and the checks that catch the recurring defects.

  8. 4 lessons · about 45 min

    Step flashing, valleys, hips and ridges

    How roof-to-wall step flashing and kickouts, valley metal, hip caps and ridge caps are installed: the lapping rule they share, the valley widths and linings in a 2018 IRC reproduction, how each piece is held, worked lengths and counts, and the checks that catch recurring defects.

  9. 4 lessons · about 44 min

    Through-wall flashing, end dams and weeps

    Where through-wall flashing goes in a masonry wall and how its drip, rise, end dams and weeps work; which metals published guidance supports; how a head flashing is installed and its lengths worked out; and the defects to check before brick covers it.

  10. 4 lessons · about 44 min

    Windows, doors and opening transitions

    How a window or door opening is flashed so water drains out instead of in: the parts and their lap order, the standards and limits that apply, worked piece lengths, and how to find and correct defects.

  11. 4 lessons · about 33 min

    Penetrations, curbs, skylights and equipment

    The terms, materials and order of work for flashing pipes, equipment curbs and skylights, which document sets each dimension, and how to inspect and record the finished detail.

  12. 4 lessons · about 40 min

    Expansion joints and thermal movement

    Why flashing metal changes length with temperature, how coefficients and published specifications set joint spacing, and how to lay out, install, inspect and document expansion joints on a run.

  13. 4 lessons · about 41 min

    Sealants, compatibility and joint design

    What a sealant is for, how to read a C920 label, which sealants suit metal and which do not, how to work out a joint width and depth, the sealing sequence, and how to test, log and diagnose a sealed joint.

  14. 4 lessons · about 51 min

    Field inspection and leak remediation

    How a crew inspects installed flashing and investigates a leak: find the cause before repairing, use each test only where it fits, respect the warranty, and keep a record of what was found and fixed.