Architectural Flashing Supply
Start a Quote
Tier 3

Professional Installation

7 of 14 modules published. Each module is four lessons, a question bank and a practical task.

  1. 4 lessons · about 66 min

    Jobsite readiness and hazard controls

    The federal construction rules a flashing crew meets on the roof: edges, holes, warning lines, fall arrest, ladders, power lines, heat and hot work. A documented readiness method with worked examples, then how to spot, fix and record common jobsite defects.

  2. 4 lessons · about 57 min

    Substrates, blocking and attachment

    What edge metal is fastened to and how that wood is anchored, the ED-1 minimums and the treated-wood fastener rules, a field method with worked examples and a maker's installation order, and how to find, fix and record attachment defects.

  3. 4 lessons · about 51 min

    Underlayments, membranes and WRBs

    What roof underlayment, ice barrier membranes and wall water-resistive barriers do and how each laps with the metal, the code rows and product limits that govern them, how they are installed with worked extent and lap checks, and the faults an inspection looks for.

  4. 4 lessons · about 53 min

    Eaves, rakes and drip edge

    What a drip edge does at the eave and the rake, the code, roofing-maker and AFS limits behind it, how a crew sequences and laps the metal with underlayment and ice barrier, with worked examples, and how to inspect and fix the common defects.

  5. 4 lessons · about 42 min

    Parapet coping and cap installation

    How a parapet coping is built up and installed: its layers and parts, the documents and standards that govern it, a step-by-step field method with worked examples, and how to inspect it and trace a leaking joint to its cause.

  6. 4 lessons · about 42 min

    Gravel stops, fascia and edge metal

    How a two-part roof edge goes on in the field: the parts and how each cover engages its cleat, the values Drexel prints, the Gravel Stop sequence with worked layouts, the defects to inspect for, and OSHA's fall-protection rules at the edge.

  7. 4 lessons · about 38 min

    Base flashing, counterflashing and reglets

    How a roof-to-wall joint is installed: base flashing terminated up the wall, counterflashing lapped over it from a reglet or receiver, the documents that set each height, lap and spacing, the silica and fall rules for the crew, and the checks that catch the recurring defects.