Start from the drawings
IMI's flashing checklist, written for flexible membrane flashing, says flashing work must meet or exceed local code, the maker's instructions and the project documents; conflicts go to the designer.
Before you set anything, confirm the material, rise, extension past the opening, dam positions, joint method and weep spacing.
This lesson follows a window head over a steel lintel in brick veneer.
Ten steps in a column: check the drawings and the metal, clean the bearing, bed the flashing from the face to the backup, run it past the opening, form and seal the end dams, lap the pieces by the method the specification names, terminate behind the barrier, place a mortar collection device, lay the first course with weeps above the flashing, and inspect and photograph before covering.
- 1
- Check the drawings: material, rise, extension past the opening, dam positions, joint method and weep spacing
- 2
- Clean the bearing; the water/air barrier is already on the backup before the flashing (IMI)
- 3
- Bed the flashing in sealant from outside the face across the cavity
- 4
- Run the flashing past the opening and up the backup at least 8 in
- 5
- Form and seal the end dams, at least 1 in up, at or beyond the lintel ends
- 6
- Lap the pieces: a 6 in sealed lap (BIA's figure for plain flexible flashing, York's for its own stainless; sheet-metal splices follow the maker) or, for concrete masonry, a 1/4 in gap under a bonded membrane (CMHA)
- 7
- Terminate the top edge, then lap the water-resistive barrier over the flashing afterward (BIA, at least 6 in)
- 8
- Place a mortar collection device above the flashing
- 9
- Lay the first course with open head joint weeps immediately above the flashing
- 10
- Inspect and photograph before any brick covers the flashing