Tier 3 · Professional Installation

Eaves, rakes and drip edge

What a drip edge does at the eave and the rake, the code, roofing-maker and AFS limits behind it, how a crew sequences and laps the metal with underlayment and ice barrier, with worked examples, and how to inspect and fix the common defects.

4 lessons · about 53 min · 10 diagrams · 5 videos

Version 1.0.0

Builds on these modules

Related Academy lessons

Lessons

0 of 4 complete

  1. Lesson 1 · 14 min · 12 slides · 12 questions

    Eaves, rakes and drip edge: principles and terminology

    Why a roof edge needs metal, the parts of a drip edge and its L and T profiles, the shapes FlashDraft holds, where the code requires drip edge, and the safety boundary at the edge.

    You will be able to: Tell an eave from a rake, name the parts and profiles of a drip edge, state where the 2018 IRC requires one, and state who installs it and the fall rules at the edge.

    Not startedStart →
  2. Lesson 2 · 15 min · 12 slides · 13 questions

    Eaves, rakes and drip edge: materials, standards and design constraints

    The 2018 IRC minimums, editions and amendments, fastening and overhang rules by maker, edge metals, high-wind programmes, ice barriers, metal-panel and membrane-roof edges, and the AFS limits that shape a custom drip edge.

    You will be able to: State the 2018 IRC drip edge minimums and why the edition matters, layer the shingle maker and any high-wind programme on top, pick an edge metal, and apply the AFS limits to an edge profile.

    Not startedStart →
  3. Lesson 3 · 14 min · 12 slides · 12 questions

    Eaves, rakes and drip edge: methods and worked application

    The installation sequence on a shingle roof, the three published eave methods with an ice barrier, rake laps and the eave-rake corner, when to photograph, starter and overhang, and four worked examples.

    You will be able to: Sequence eave metal, underlayment or ice barrier and rake metal on a gable roof, lap and nail it, and work out pieces, nails, rake length and face height with units and stated assumptions.

    Not startedStart →
  4. Lesson 4 · 10 min · 12 slides · 7 questions

    Eaves, rakes and drip edge: defects, verification and case study

    An inspection checklist for eaves and rakes, correct and incorrect pairs, the recurring defects with their rules and fixes, a worked case of a leaking gable corner, and how to record the evidence.

    You will be able to: Inspect eave and rake metal before it is covered, diagnose a plausible defect, name the rule it breaks with its source, choose a fix and document the evidence for review.

    Not startedStart →

Practical task

Prepare a job packet for the eaves and rakes of one shingle roof (a real job, or a gable roof you are given): decide the rules that apply, sequence and size the metal, check it against the sources, and analyse one planted defect.

Hand in

  • A decision rationale: roof covering, adopted code edition and amendments (ask the building department), the shingle maker's instructions, any high-wind programme, whether an ice barrier is required, and the eave method chosen, each with its source
  • A marked-up section at the eave and at the rake showing the layer order: deck, underlayment or ice barrier, drip edge, starter and shingles
  • Measurements and assumptions: eave and rake runs, pitch and slope factor, pieces and laps, the last piece, nail spacing chosen and why, profile and face height against the sheathing
  • A quality checklist completed for each eave and rake, with photographs of each corner before the shingles cover it
  • A defect analysis of one planted defect: what was found, the rule it breaks and whose rule it is, the fix, and the check that proved it

Rubric

CriterionMeets the standard when
SourcesEvery value names its owner: the code and edition, the shingle or membrane maker, a programme, or an AFS register.
Layer orderEave: metal on the deck and underlayment over it, or a named maker method agreed with the inspector. Rake: metal over the underlayment.
Laps and cornerLaps meet the 2 in minimum or the job's larger value; rake laps run upper over lower; the rake bottom passes the eave metal.
FasteningSpacing is within the 12 in maximum and the maker's closer value where it applies; nails are high in the flange, none in the face.
MeasurementsPieces, last piece, nail count and rake length are worked with units; the face is checked against the sheathing.
Defect analysisThe defect is documented with a photo and measurement, the rule, the fix and the verification.
SafetyThe packet states the fall protection the employer's plan provides for edge work and how the ladder is set.

Module quiz

10 questions drawn from a bank of 44; a new set each attempt. Pass mark 80%.

1. According to JLC, what should the crew show the inspector?
2. What is the sloped length of the example rake?
3. At what spacing does ARMA fasten drip edge?
4. In the eave example, how long is the last piece?
5. How many legs does the FlashDraft Drip Edge template have?
6. Counting the face alone, what is the shortest face that reaches 1/4 in below 5/8 in sheathing?
7. How far must adjacent drip edge pieces overlap under the 2018 IRC?
8. What minimum lap does the IBHS FORTIFIED Home High Wind form ask for?
9. How far does ARMA have the shingles extend past an L profile drip edge?
10. What does ARMA give a drip edge at its lowest edge?