Through-wall flashing, end dams and weeps

Where through-wall flashing goes in a masonry wall and how its drip, rise, end dams and weeps work; which metals published guidance supports; how a head flashing is installed and its lengths worked out; and the defects to check before brick covers it.

4 lessons · about 44 min · 11 diagrams · 1 video

Version 1.0.0

Builds on these modules

Related Academy lessons

Lessons

0 of 4 complete

  1. Lesson 1 · 10 min · 10 slides · 7 questions

    Through-wall flashing, end dams and weeps: principles and terminology

    What through-wall flashing does in a drainage wall, where it goes, how it reaches and passes the face, what end dams and weeps are for, AFS's Through Wall template, and the OSHA zone around a wall being built.

    You will be able to: Name the parts of a through-wall flashing assembly, say where it goes, define end dam, weep and drip, and state the safety boundary for working beside a masonry wall under construction.

    Not startedStart →
  2. Lesson 2 · 11 min · 11 slides · 8 questions

    Through-wall flashing, end dams and weeps: materials, standards and design constraints

    Why BIA endorses stainless steel and copper and does not recommend galvanized steel or aluminum, how membranes use a metal drip edge, the weep and lap numbers and who publishes each, and what AFS can make.

    You will be able to: Choose a through-wall flashing material from published guidance, state which numbers are recommendations, code limits or manufacturer values, and match them to what AFS can fabricate.

    Not startedStart →
  3. Lesson 3 · 13 min · 12 slides · 8 questions

    Through-wall flashing, end dams and weeps: methods and worked application

    The installation sequence for a head flashing from bearing to weeps, how end dams are formed, two worked examples with every input labelled, and how sills and stepped flashing differ.

    You will be able to: Set a head flashing over a lintel in sequence, form and check its end dams, work out piece lengths and weep counts from stated inputs, and flash a sill and a stepped run.

    Not startedStart →
  4. Lesson 4 · 10 min · 11 slides · 7 questions

    Through-wall flashing, end dams and weeps: defects, verification and case study

    Missing and misplaced end dams, flashing stopped behind the face, unsealed laps, punctures, weeps in the wrong place or clogged, a pre-cover inspection card, photographs of hidden work, and a constructed case of a stained window head.

    You will be able to: Recognise eight through-wall flashing defects, tie each to a published rule, check the work before it is covered, record it, and reason from a symptom to a likely cause.

    Not startedStart →

Practical task

Build a job packet for the head flashing over one window in a brick veneer wall (your own project or a hypothetical one): choose the material, work out the length and the weep count, mark up the end dams on a sketch, and write the checks you will make before the brick goes on.

Hand in

  • A decision rationale: the material you chose and the published guidance behind it (BIA, a manufacturer or the specification), with the documents that govern named
  • A marked-up section and elevation sketch showing the drip, the rise up the backup, the end dams at or beyond the lintel ends, the laps and the weeps
  • An assumptions sheet with units: opening width, extension past each jamb, piece length, lap method and weep spacing, each labelled as from the drawings, a code, a trade body or a manufacturer
  • A length and weep calculation, with the arithmetic shown, for your opening
  • A defect analysis: which two of the eight defects your detail is most exposed to, and the check that would catch each before the brick covers the flashing

Rubric

CriterionMeets the standard when
MaterialThe material choice cites published guidance and does not present galvanized steel or aluminum as a recommended through-wall flashing in brick masonry.
Source labelsEvery number is labelled as the drawings, a code limit, a trade body recommendation or a manufacturer value, and the specification is named as governing.
End damsEach end that stops has a dam turned up into the head joint at least 1 in, placed at or beyond the lintel end, with its sealing or soldering method named.
ArithmeticThe head length is the opening plus the extension at each end, the weep spacing does not exceed the stated maximum, and the working is shown.
Weeps and cavityWeeps are immediately above the flashing, open and clear, and the plan keeps the air space clear of mortar droppings.
Safety and recordThe packet notes the limited access zone while the wall is built and plans photographs of the flashing before it is covered.

Module quiz

10 questions drawn from a bank of 30; a new set each attempt. Pass mark 80%.

1. How large is the OSHA limited access zone along a masonry wall under construction?
2. What is the longest piece AFS's Thalmann folder makes?
3. In a barrier wall, what role does BIA give through-wall flashing?
4. By how much does BIA recommend higher pieces of stepped flashing overlap the layer below?
5. Why does BIA say weep tubes are not recommended?
6. What thickness does BIA recommend at least for stainless drip edges and typical masonry flashings?
7. A 360 in base run is covered with 120 in pieces, each joint a 6 in lap. How many pieces are needed?
8. How does York say its end dams are to be made?
9. Where does BIA say weeps are required?
10. What maximum spacing does BIA recommend for open head joint weeps?