Windows, doors and opening transitions
How a window or door opening is flashed so water drains out instead of in: the parts and their lap order, the standards and limits that apply, worked piece lengths, and how to find and correct defects.
4 lessons · about 44 min · 14 diagrams · 1 video
Version 1.1.5
Builds on these modules
Lessons
0 of 4 complete
Lesson 1 · 10 min · 10 slides · 7 questions
Windows, doors and opening transitions: principles and terminology
Why openings leak, how a drained opening works, the sill pan, the jamb strips, the pieces named at the head by TN05, Guertin and the AFS catalog, the lap order, and the fall-protection boundary at an open rough opening.
You will be able to: Name the parts of a flashed window or door opening, explain drained installation, shingle-fashion lapping, back dams and end dams, and state the safety boundary at an open wall opening.
Not startedStart →Lesson 2 · 10 min · 11 slides · 7 questions
Windows, doors and opening transitions: materials, standards and design constraints
Which standards and code text touch window and door flashing, what AFS fabricates for openings and its limits, how metal and treated lumber interact, and the shape values makers and builders publish.
You will be able to: Identify the standards and code text that govern opening flashing, the metals and limits AFS works within, and the compatibility and shape constraints that affect a metal head or cap flashing or a sill pan.
Not startedStart →Lesson 3 · 15 min · 12 slides · 10 questions
Windows, doors and opening transitions: methods and worked application
The installation sequence from pan flashing to head flashing, which sealant and tape rules belong to which product, metal pan and storefront details, and four worked examples with every input labelled.
You will be able to: Follow the crew sequence for a flanged window with the WRB on, apply the lap and sealant rules, and work out head piece, jamb flashing and sill pan lengths from labelled example inputs while recording assumptions and units.
Not startedStart →Lesson 4 · 9 min · 9 slides · 5 questions
Windows, doors and opening transitions: defects, verification and case study
Typical sill, head and jamb defects and why they fail, an inspection list to use before cladding covers the work, and a constructed case study traced to its cause and corrected.
You will be able to: Diagnose common opening-flashing defects from their symptoms, check an opening against a written list before it is covered, and explain the corrective steps for a constructed stained-window case.
Not startedStart →
Practical task
Choose one window or door opening, real or from a drawing. Write a one-page flashing plan: the sequence you would follow, which maker's instructions govern, the lengths of the head piece (the piece your maker or source names), jamb flashing and sill pan with every input and unit shown, and an inspection list to complete before the cladding covers the work.
Hand in
- A numbered sequence from preparing the WRB to folding the flap down, naming the lap order at the sill, jambs and head
- A length table for the head piece (say which piece and which source or maker names it), jamb flashing and sill pan showing the formula, each input with its unit and where it came from, and whether each piece fits within 126 in
- A marked-up inspection list of at least eight points, with a note of which maker or source each number on it belongs to
Rubric
| Criterion | Meets the standard when |
|---|---|
| Lap order | Pan first, jambs over the pan, head flashing over the jambs and the WRB flap folded down, following the TechNote's six steps or the maker's own, with no reverse lap anywhere in the plan. |
| Drainage | The bottom flange is left open to drain, the pan has a back dam or slope and end dams, and the plan says how the interior air seal avoids blocking the drainage path. |
| Lengths and units | Each length follows the opening-flashing formula, every input is labelled as measured, example or from a maker, and units are shown on every line. |
| Source discipline | Every tape length, sealant gap or slope is attributed to the product or author it comes from, and none is presented as code. |
| Safety and inspection | The plan applies the 39 in and 6 ft test to any upper-floor opening and names the three systems 1926.501(b)(14) allows (guardrail, safety net, personal fall arrest), and the inspection list is complete before concealment. |
