The crew sequence
The TechNote's sequence for a flanged window with the WRB on. Read the maker's instructions first; DuPont wants the rough sill level or sloped out.
- Prepare the WRB: cut, fold in at jambs, fold up at head
- Install the pan flashing
- Set the window to the maker's instructions
- Install the jamb flashing
- Install the head flashing (TN05 step 5)
- Fold the flap down and tape the diagonals
A top-to-bottom flow of eight boxes: read the maker's instructions, the TechNote's six numbered steps from preparing the WRB to folding the flap down, then inspect.
- 1
- Prepare the WRB at the opening
- 2
- Install the pan flashing
- 3
- Set the window to the maker's instructions
- 4
- Install the jamb flashing
- 5
- Install the head flashing (TN05 step 5): over and beyond the jamb flashing, and over the drip cap if installed
- 6
- Fold the WRB flap down and tape the diagonal seams
Sources
- TechNote: Window and Door Flashing - Code Requirements and Best Practices (September 2015; quotes the 2015 IRC section R703.4), as hosted by the Town of Ocean City, Maryland - TechNotes builder series
- DuPont Flashing Products Installation Guidelines: Integral Flanged Window with Wood Bump-Out Frame (43-D100978, March 2021) - DuPont (copy hosted by EMI Supply)
