The sealing sequence
This order follows the public sample specifications.
- Read the section and data sheet.
- Check width, temperature and dryness.
- Clean the faces; mask beside the joint.
- Apply primer before installing the backer rod or bond-breaker tape.
- Place the rod or tape at uniform depth.
- Gun, fill, tool; remove the masking.
- Pull-test and log it.
A vertical flow of ten steps in four phases: check, prepare, install and verify, from reading the section and data sheet to pull-testing and logging.
Sources
- UFGS 07 92 00 Joint Sealants (August 2023), Unified Facilities Guide Specification - USACE / NAVFAC / AFCEC (via the Whole Building Design Guide)
- VA Master Specification Section 07 92 00 Joint Sealants (04-01-22) - U.S. Department of Veterans Affairs (via the Whole Building Design Guide)