Architectural Flashing Supply
Start a Quote
Installation Sequence Studio

ES-1 edge systems, installed in order

Each sequence follows Drexel Metals' published installation guide for one ES-1 edge system that AFS fabricates as an authorized Drexel fabricator: the lettered parts, every step, the fasteners exactly as printed, and a field checklist you can print.

This sequence follows Drexel Metals' published installation guide for the system. The project's specifications, the approved shop drawings and the roofing membrane manufacturer's requirements govern; where they differ, follow them and ask AFS.

Copings

Snap Coping-Max

16 Ga Galv. Intermittent Cleat, Snap-On Cover

4 steps · 12" Face Max; 32" Wall Max; 6" Back Max

Open the sequence

Snap Coping-Max-C

16 Ga Galv. Segmented Cleat w/Spring Clip, Snap-On Cover

4 steps · 12" Face Max; 32" Wall Max; 6" Back Max

Open the sequence

Econo Coping LT

24 Gauge Formed Cont Cleat; (Front Face) Exposed Fastener; (Back Face) Drip Profile

4 steps · 6" Face Max; 24" Wall Max; 5.5" Back Max

Open the sequence

Econo Coping

22 Gauge Formed Cont Cleat; (Front Face) Exposed Fastener; (Back Face) Drip Profile

4 steps · 6" Face Max; 20" Wall Max; 5.25" Back Max

Open the sequence

Fascia

Fascia LT

22 Gauge Cont Cleat, Snap-On Cover, 10' Lengths

4 steps · 3", 4.5", 6", 8" faces

Open the sequence

Gravel stops

Gravel Stop

22 Gauge Cont Cleat, Strip-In Cover, 10' Lengths

5 steps · 10" Face Max

Open the sequence

Econo Gravel Stop

24 Gauge Cont Cleat, Strip-In Cover, 10' Lengths

5 steps · 7" Face Max

Open the sequence

Drip edges

Drip Edge LT

24 Gauge Cont Cleat, Strip-In Cover, 10' Lengths

5 steps · 6" Face Max

Open the sequence

Drip Edge

22 Gauge Cont Cleat, Strip-In Cover, 10' Lengths

5 steps · 6" Face Max

Open the sequence

Gutters

AFS fabricates the Drexel ES-1 edge systems above. Drexel's GT-1 gutter systems are not listed here because AFS is not certified to fabricate them.