ANSI/SPRI/FM 4435/ES-1 edge system: 22 Gauge Formed Cont Cleat; (Front Face) Exposed Fastener; (Back Face) Drip Profile. 6" Face Max; 20" Wall Max; 5.25" Back Max.

Drexel guide (PDF)

This sequence follows Drexel Metals' published installation guide for the system. The project's specifications, the approved shop drawings and the roofing membrane manufacturer's requirements govern; where they differ, follow them and ask AFS. Source: Drexel Metals, “Econo Coping Installation Guide”.

Step 1 of 4

Installing 22ga Galvanized Cleat

  1. Before installing the cleat, make sure every metal component is isolated from ACQ-treated lumber with an appropriate membrane.
  2. Butt the cleats together at corners.
  3. Install the cleat working away from the corners.
  4. Attach the cleat with a nail into each pre-punched hole; within 3'-0" of a corner, nail at 6" on center.

As printed in the Drexel guide

“Attach the Cleat using 1-1/4" S.S. Ring Shank Nails provided, into each pre-punched hole.”

“When within 3'- 0" of corners, attach Cleat with 1-1/4" S.S. Ring Shank Nails at 6" on center.”

Common mistakes this step guards against

  • Do not set metal on ACQ-treated lumber without an isolating membrane.
  • Do not nail at more than 6" on center within 3'-0" of a corner.
Loading 3D view…
This step does not install the cover. Shown: the FlashDraft “Coping Cap - Both Edges Open” section, the cover only - the cleat, splice plates and fasteners are in the parts list.

Parts, lettered as in the guide

  • AEcono Coping 10'- 0" standard lengths
  • B22ga Galvanized Continuous Cleat 10'- 0" lengths
  • CEcono Coping Miter Cap (Outside corner shown)
  • D1-1/4" S.S. Ring Shank Nail at 12" o.c. (6"o.c. within 3'-0" of corners) (Included and required)
  • E#9 -13x1-1/2" S.S. Washered Screw at 12" o.c. (Included and required)

Field checklist

Econo Coping - from Drexel's guide. Tick each item as it is done; print this page for the crew.

Common mistakes

Each line is the reverse of an instruction the Drexel guide states.

  • Do not set metal on ACQ-treated lumber without an isolating membrane. (step 1)
  • Do not nail at more than 6" on center within 3'-0" of a corner. (step 1)
  • Do not butt sections tight - leave the 1/8" gap for thermal movement. (step 3)
  • Do not cut lengths that leave short sections next to each other. (step 3)
  • Do not leave end caps or end terms unrestrained - use at least two screws through the roof-side leg. (step 4)

Notes printed on the guide

  1. Isolate all metal parts from ACQ-treated wood, or any other galvanically incompatible material, with an appropriate membrane.
  2. Appliance attachments - lightning rods, signs, antennae - that penetrate the water seal, set up a galvanic reaction or otherwise compromise the roof edge system are to be eliminated or isolated, per section 8.0 of ANSI/SPRI ES-1. Isolate appliances from the edge system or do not attach them to it; the lightning protection manufacturer gives the attachment instructions.

Printed on the section detail

  • Detail: Econo Coping - 16" and 20" max. tested widths
  • Face height 6" max.
  • Rear face 5-1/4" max.
  • 1-1/4" S.S. Ring Shank 12" on center through pre-punched hole and membrane
  • #9 S.S. Washered Woodscrew 12" on center
  • Optional shim by installer

Drexel published ratings

Sustained pressure as Drexel publishes it (Drexel Metals DM-19063 "ES-1_GT-1 Certification Program Product Line Card" 12.09.25). Design Engineer must apply the Factor of Safety.

CoverFace up toWall up toCleatSustained pressure
24 gauge6"16"22 ga-110 psf
24 gauge6"20"22 ga-75 psf
.040 AL6"16"22 ga-145 psf
.040 AL6"20"22 ga-65 psf