Architectural Flashing Supply
Start a Quote
Integrated master capstone · Lesson 3 of 4

Integrated master capstone: methods and worked application

The eight-step method run on the teaching job: flat width and limits, piece count, joints, movement, wind beside tested ratings, one maker's installation sequence, and the packet that carries every assumption.

You will be able to: Apply a documented method to the teaching job: check the profile against AFS limits, plan pieces and joints, compute movement, set wind demand beside tested ratings, and assemble the packet with its assumptions.

12 min · 12 slides · 8 questions

All lessons in this module
Slide 1 of 12

The method in eight steps

Eight steps, each ending in a document you can hand over.

  • Write the assumption register
  • Flat width and limits check
  • Pieces for the run
  • Joints
  • Movement of a section
  • Wind demand beside tested ratings
  • Installation sequence and inspection points
  • Assemble the packet

Videos for this lesson

What this video shows: A manufacturer's walk-through of sizing metal edge coping, materials, installation tools and ES-1 installation requirements for its own snap-on coping system. It is a different system from the Drexel cleat-and-cover coping taught in this module.

Video: Metal Snap-On Coping; R-Mer Edge Coping -- Application Excellence by The Garland Company, Inc., on YouTube. Chosen from the video's published description.

Glossary

Mold-line girth
The flat width of a profile measured to the sharp corner of each bend: the legs plus hem allowances, which AFS uses as its quoting blank.
Hem allowance
Flat material an AFS hem consumes: for an open hem twice the fold plus the gap, for a smashed hem twice the fold. The register calls it a quoting simplification, not a real bend deduction.
Splice lap
The overlap between lengths where a run is joined. AFS's per-project settings give it no default, so the specification or maker sets it.
Cleat
The strip a cover hooks over, fastened to the substrate. In Drexel's Econo Coping system it is a 22 gauge galvanized continuous cleat in 10 ft lengths.
Method A and Method B
The two ways AFS's wind tool turns strength-level pressure into a number to compare with a tested rating: times 2.0, or times 0.6 and then 2.0. The engineer of record chooses.
Assumption register
A list of every input to a job marked as given, assumed or to confirm, so no assumption travels unwritten.