Architectural Flashing Supply
Start a Quote

Design Center · 12 calculators

Calculators for sheet metal and the building envelope

Calculators that run in your browser - nothing is sent anywhere until you ask AFS for a quote. Each result says what it is, how it was calculated and what it does not cover.

Flashing Profile & Bend Development

Legs, bends and hems to a blank width, bend schedule, weight and an AFS fabrication check.

Open calculator

Material Takeoff & Nesting

Pieces into 10 ft strips and 48 in sheets, utilization and weight, ready to send to AFS.

Open calculator

Roof Edge, Coping & Fascia

Edge runs, corners and terminations to pieces, joints, end caps and cleat length.

Open calculator

Thermal Movement & Compatibility

Expansion and contraction of a run between metal temperature extremes, and dissimilar-metal screening.

Open calculator
Preliminary - review required

Roof Drainage Flow Screening

Design flow from area and a sourced rainfall intensity, per outlet. Preliminary.

Open calculator
Preliminary - review required

Wind Uplift & Edge Screening

ASCE 7-16 edge pressures for comparison with ES-1 tested capacity. Preliminary.

Open calculator

Wall & Roof Assembly R-Value, U-Factor & Dew Point

Total R and U-factor of a layered assembly, interface temperatures and a steady-state dew-point screen. Preliminary.

Open calculator

Cladding Panel Layout & Opening Flashing

Balanced panel layouts, expansion-joint counts from thermal movement, and flashing cut lists for openings.

Open calculator

Roof Pitch, Area, Hip/Valley & Panel Coverage

Pitch in x:12, degrees and percent; sloped area, rafter and hip/valley lengths; standing-seam panel count and length.

Open calculator

Geometry, Slope & Unit Conversion

Exact unit conversion, right triangles, slope, a 1:12 ramp check and tolerance stack-up.

Open calculator
Preliminary - review required

Occupant Load, Egress & Accessibility Screening

Occupant load, egress width and exit count from the factors you enter from your adopted code, plus a ramp slope check. Preliminary - not a code determination.

Open calculator
Preliminary - review required

Embodied Carbon, Insulation Comparison & Preliminary Envelope Loads

Embodied carbon of options from EPD factors you enter, insulation R comparison, and conductive heat loss Q = U·A·ΔT. Preliminary.

Open calculator

Enter it once

One project carries the profile, material and edge runs into every tool. Nothing is typed twice.

See how it was worked out

Every answer shows its status, the formula, the assumptions and the published source of each value.

Send it to AFS

The takeoff goes to the shop as a request for quote, stamped preliminary with its calculation fingerprint.

What these tools are not

They are design aids for preliminary sizing and quantities. They do not replace the engineer of record, the plumbing designer or the governing code, and no result is a fabrication release until AFS reviews it. Read the method sheets for exactly what each one covers.