The chain of evidence
Evidence runs in a chain: a standard says how to test, a laboratory tests one exact assembly, a report records it, a listing or approval may follow, then submittal, review and a comparison with the installed work.
ES-1 gives basic requirements for resistance testing of roof edge systems under simulated wind load, on low-slope roofs of 2:12 (9.5 degrees) or less.
Seven boxes, A to G, joined by downward arrows: A test standard, B test, C test report, D listing or approval, E submittal, F review, G inspection. A navy band below says ES-1 asks that tested components be documented for the owner and installed as tested.
- A
- Test standard: the published method, such as ES-1
- B
- Test: a laboratory loads one exact assembly
- C
- Test report: the laboratory's record of that assembly
- D
- Listing, evaluation report or approval, with a number and often an expiry
- E
- Submittal: the contractor sends the evidence to the design team
- F
- Review by the design team and the building official
- G
- Inspection: installed work compared with the tested assembly