Tier 6 · Architectural Specification and Engineering

Test evidence, approvals and certifications

What counts as evidence that a flashing or edge-metal product performs: test standards, reports, listings, approvals and evaluation reports, how to match them to a project, and how to catch a bad evidence package.

4 lessons · about 45 min · 13 diagrams · 1 video

Version 1.0.0

Builds on these modules

Related Academy lessons

Lessons

0 of 4 complete

  1. Lesson 1 · 10 min · 9 slides · 8 questions

    Test evidence, approvals and certifications: principles and terminology

    What counts as evidence that a flashing or edge-metal product performs: the chain from test standard to inspection, who issues which document, why a test proves only one assembly, and what AFS can show today.

    You will be able to: Tell a test standard, a test report, a listing, an evaluation report, an approval and a manufacturer claim apart; say who issues each; and state what AFS can and cannot show as evidence today.

    Not startedStart →
  2. Lesson 2 · 14 min · 12 slides · 11 questions

    Test evidence, approvals and certifications: materials, standards and design constraints

    Which evidence fits which product: the RE-1, RE-2 and RE-3 tests, how results are written, installing as tested, extension by similarity, code editions, other routes to acceptance, and material and finish evidence.

    You will be able to: Pick the ES-1 test a product needs, read how a result is expressed, explain why an assembly must be installed as tested, apply the five-condition similarity rule, and name the code, programme, approval and material evidence that applies.

    Not startedStart →
  3. Lesson 3 · 11 min · 10 slides · 8 questions

    Test evidence, approvals and certifications: methods and worked application

    A documented method for matching evidence to a project, with an illustrative demand worked through AFS's wind function, Drexel's published ratings read against it, a range check, a coping caution and a submittal evidence matrix.

    You will be able to: Apply a seven-step method to match evidence to a project: state the demand and its basis, read a published rating against it, run the range check, flag the coping caution, and build an evidence matrix with a verdict per row.

    Not startedStart →
  4. Lesson 4 · 10 min · 10 slides · 7 questions

    Test evidence, approvals and certifications: defects, verification and case study

    How to catch a bad evidence package: ten defects, eight checks, verification at the issuer, an illustrative coping case study, who decides the fix, how to log it, and why no document is a guarantee.

    You will be able to: Name ten ways an evidence package goes wrong, verify a document at its source, diagnose an illustrative coping submittal, say who decides the correction, and record the finding.

    Not startedStart →

Practical task

Build an evidence packet for one roof-edge detail: name the ES-1 test it needs, mark up the assembly, line the evidence up against the requirement in a matrix, compare an illustrative demand with a published rating, and list what is missing and who must supply it.

Hand in

  • A decision rationale naming the ES-1 test (RE-2 or RE-3) the detail needs and why, with the ES-1 section it rests on
  • A marked-up section showing the cover, cleat, fasteners and their spacing, the splice and the nailer, with the parts the test does and does not cover labelled
  • An evidence matrix with one row per requirement: the evidence offered, whether it matches the exact assembly, size, date and scope, and a verdict of accept, request or reject
  • A demand-versus-published table for stated, illustrative wind inputs, with the factor and the basis stated, and the published values labelled as the manufacturer's
  • A gap list naming each missing document and who must supply it, plus a one-page "what to ask the supplier" list

Rubric

CriterionMeets the standard when
Test choiceThe packet picks RE-2 or RE-3 correctly from the exposed horizontal part and cites ES-1.
Assembly matchEvery attribute of the assembly is compared with the record: product, metal, gauge, cleat, fasteners, spacing, splice and size.
BasisDemand and published value are on the same stated basis, with the factor named and attributed to the engineer of record.
No pass or fail from one coping numberA coping with one published number is marked "request the test report", not passed or failed.
Gaps namedEach missing document is named with who must supply it; nothing is guessed or assumed.
VerdictsEach matrix row ends in accept, request or reject with a reason that cites a document.
SafetyThe packet states that evidence review is desk work and that anyone on a roof edge follows 29 CFR 1926.501.

Module quiz

10 questions drawn from a bank of 34; a new set each attempt. Pass mark 85%.

1. ES-1 applies to roofs with what slope?
2. In the illustrative project, what is the perimeter face pressure with AFS's factor of 2.0?
3. To check NRCA's edge-metal certification, what do you search Intertek's directory for?
4. What does NIST say NVLAP accreditation does not imply?
5. What top-to-face load ratio does RE-3 use?
6. What does AFS's register hold for ES-1 laboratory reports of AFS's own assemblies?
7. Whose view does the lesson give for why tests should be run on systems as made by a given fabricator?
8. How many conditions must all hold, in SPRI's FAQ, for a product to have equal resistance to a tested one?
9. In 24 gauge, what does the Econo Coping rating do as the wall goes from 16 in. to 20 in.?
10. What should you do when a coping has one published number and the test report is not in hand?