Architectural Flashing Supply
Start a Quote
Complex parapets and roof edges · Lesson 3 of 4

Complex parapets and roof edges: methods and worked application

A ten-step method for complex edges, eight worked examples with their inputs, and the installation sequence at corners, ends and a taller wall as makers and trade sources publish it.

You will be able to: Apply a documented method to a complex roof edge: check fire parapet height, coping width against a published range, corner counts, joints, girth and raked lengths, and write down every input and unit.

12 min · 12 slides · 7 questions

All lessons in this module
Slide 1 of 12

A method for complex edges

This module's method, built from the sources in lessons 1 and 2: map every condition on the roof plan, check for a required fire parapet, get the wind demand by region from the engineer, choose a tested system whose published range covers your sizes, detail corners and ends, settle layers, movement and drainage, then review the submittal.

Ten-step method for a complex roof edgeA vertical flow of ten numbered steps with the owner of each in a navy chip: map every condition, fire parapet check (30 in, 18 in noncombustible faces), wind region and height basis, tested system and range, corners ends and steps, layers over the top, movement joints, drainage and scuppers, appliances, submittal review. A red box at the end reads fabricate to approved drawings, AFS.Method for a complex roof edgeEach step names who owns it1Map every conditionDesigner2Fire parapet check18 in: noncombustible facesDesigner3Wind and height basisEngineer4Tested system, rangeOutside it: redesignDesigner, maker5Corners, ends, stepsCorners: corner loadDesigner, maker6Layers over the topDesigner7Movement jointsDesigner8Drainage, scuppersDesigner9AppliancesDesigner10Submittal reviewDesignerFabricate to approved drawingsAFSIllustrative; the designer of record details the project.

A vertical flow of ten numbered steps with the owner of each in a navy chip, ending in a red box reading fabricate to approved drawings, AFS.

1
Map every condition on the roof plan: runs, corners, ends, steps, raked tops, scuppers, joints and appliances
2
Check whether a fire parapet is required, and its height and noncombustible top
3
Get the wind demand by region and the height basis from the engineer of record
4
Choose a tested system whose published range covers the sizes drawn
5
Detail corners, ends and steps with parts from the same system
6
Settle the layers over the top: membrane under the coping, sealed nailers
7
Coordinate movement joints with the masonry
8
Drain the top and size any scuppers
9
Keep appliances off the coping
10
Review the submittal against all of this
This module's method, built from the sources in lessons 1 and 2. The designer and the engineer own the decisions; AFS appears only at the end, fabricating what the approved drawings show.

Videos for this lesson

What this video shows: A walk through sizing a metal edge coping, materials, installation tools and ES-1 installation requirements for one maker's snap-on system. Its values are Garland's. Checked against the video's description.

Video: Metal Snap-On Coping; R-Mer Edge Coping -- Application Excellence by The Garland Company, Inc., on YouTube. Chosen from the video's published description.

What this video shows: A membrane maker's steps for base flashing and the wall covering on a parapet wall, using its own self-adhered membranes; every dimension in it is that maker's for that system. Checked against the video's description.

Video: Commercial Roofing Construction Detail CT-06: Base Flashing on a Parapet Wall by CertainTeed, on YouTube. Chosen from the video's published description.

Glossary

Raked parapet
A parapet whose top slopes, so a coping's true length is longer than its plan length (AFS roof edge method).
True length
The length measured along a sloped edge: plan length times the square root of 1 plus (rise over 12) squared (AFS roof edge method).
Cleat
A formed strip fastened to the nailer that a snap-on coping hooks over; Drexel's Snap Coping guide spaces its cleats no more than 40 in on center.
End cap and end term
Coping parts that close or finish an end; Drexel's guide says they must be restrained with fasteners through the roof-side leg.
Miter
A coping piece made for an outside or inside corner; Drexel's Snap Coping guide installs miters after the cleats and before the straight lengths.