Research, testing and product development · Lesson 1 of 4

Research testing and product development: tested, calculated or claimed

The four ways to prove a requirement, verification versus validation, what ES-1 is for, how to read a reported test number, and why AFS refuses to estimate a capacity without a lab report.

You will be able to: Tell a claim from a calculation from a test, separate verification from validation, and say what one test result does and does not prove.

12 min · 12 slides · 8 questions

All lessons in this module
Slide 1 of 12

Tested, calculated or just claimed

SPRI's draft paper on ES-1 testing says to check a claim of ES-1 compliance by requesting a copy of the product's test report or an ES-1 certificate from the fabricator.

Until a report backs it, "ES-1 tested" on a flyer is only a claim.

SPRI's ES-1 FAQ gives its opinion that ES-1 testing should be performed on systems as manufactured by a given fabricator.

Glossary

Test standard
A standard that says how to load a specimen and what counts as failure, not what a building needs. ANSI/SPRI/FM 4435/ES-1 gives the basic requirements for resistance testing of roof edge systems under simulated wind load conditions.
Verification
In NASA's Systems Engineering Handbook, proof of compliance with requirements: that a product can meet each "shall" statement, shown by test, analysis, inspection or demonstration.
Validation
In NASA's Systems Engineering Handbook, showing that a product accomplishes its intended purpose in its intended environment.
Independent laboratory
A testing laboratory separate from the maker. ES-1's commentary says any roof edge system may be used provided an independent testing laboratory tests it to meet the wind design requirements.
Repeatability
In the NIST handbook, the basic precision of a gauge, computed from groups of repeated measurements of the same thing.