The screening method in six steps
A documented screening goes from site facts to numbers the engineer of record can check:
- Site facts: location, risk category, height, exposure
- Adopted ASCE 7 edition and basic wind speed
- Velocity pressure from speed, height, exposure
- Roof zones, coefficients and internal pressure
- Pressures on the basis the engineer chooses
- Hand-off: tornado check, tested assembly, gaps
A vertical flow of six navy boxes joined by arrows. 1 Site facts. 2 Edition and basic wind speed from the local authority. An amber caution box says to stop if the job is ASCE 7-22, a slope over 7 degrees or a roof over 60 feet. 3 Velocity pressure q. 4 Roof zones and coefficients. 5 Pressures on a basis. 6 Hand-off to the engineer.
- 1
- Site facts: location, risk category, mean roof height and exposure
- 2
- The adopted ASCE 7 edition and basic wind speed from the jurisdiction, never a storm category
- 3
- Velocity pressure from the speed squared, the height and the exposure
- 4
- Roof zones and coefficients, with internal pressure for enclosed or partially enclosed buildings
- 5
- Pressures on the basis the engineer chooses: strength level, allowable stress or a safety factor
- 6
- Hand-off: tornado check, tested assembly, substrate and what AFS cannot confirm