A documented method
This module's own method, built from the cited sources: nine steps for every coil, with a hold at receiving, identifying and finish inspection:
- Receive, identify, store, stage
- Feed and cut, form on AFS's Thalmann folder
- Inspect the finish, pack, ship
- Wet? Separate and dry it at once
- Finish damaged? Touch up within limits, or remake; either way, inspect again
A flow of nine numbered steps from top to bottom: receive, identify, store, stage, feed and cut, form, inspect the finish, pack, ship. After receiving, a decision asks whether the coil is wet; yes leads to separating and drying it at once. After the finish inspection, a decision asks whether the finish is damaged; yes leads either to touch-up within the limits, which goes back to the finish inspection, or to a remake, which goes back to feed and cut and passes forming and the finish inspection again. Flags mark the hold points at receiving, identifying and inspecting.
- 1
- Receive: check bands, wrap, edges and water; record it (hold point)
- 2
- Identify: gauge, material, colour name and chart, finish face, against the queue card (hold point)
- 3
- Store: indoors, chocked or racked, stack limits, first in, first out within the supplier's age limit
- 4
- Stage: watch for condensation on cold coil brought indoors (GalvInfo); dry it before it is stored or fed
- 5
- Feed and cut: padded contact points, burrs removed, cut away from finished stock
- 6
- Form on AFS's Thalmann folder; film stays on if the supplier allows
- 7
- Inspect the finish against the painted face ordered (hold point)
- 8
- Pack: faces protected, no sealed wrap
- 9
- Ship
Sources
- 10 Tips for Processing Prepainted Metal (2021) - National Coil Coating Association (NCCA)
- Care and Storage of BlueScope Exterior Products Prior to Installation (TB-7 Rev 6, November 2003) - BlueScope Steel Limited (Australia)
- Application Guidelines for Field-Applied Touch-up Paint Systems on Metal Panels (White Paper, V2, 7/2022) - Metal Construction Association