Tier 2 · Fabrication Technician

Coil handling and finish protection

How a coil is built and moved safely, what each finish fears in storage, a step-by-step handling method with a worked coil, and how to read and deal with finish defects.

4 lessons · about 47 min · 9 diagrams · 4 videos

Version 1.1.0

Builds on these modules

Related Academy lessons

Lessons

0 of 4 complete

  1. Lesson 1 · 12 min · 12 slides · 10 questions

    Coil handling and finish protection: principles and terminology

    What a master coil, slit coil, eye, lap, band and PIW are, how thin a factory finish is, and the OSHA rules that apply to forklifts, slings, cranes and stacked coils.

    You will be able to: Name the parts of a coil and its finish, use the words coil handling is described in, and state the safety boundaries for moving, storing and opening a coil.

    Not startedStart →
  2. Lesson 2 · 12 min · 12 slides · 11 questions

    Coil handling and finish protection: materials, standards and design constraints

    What painted, galvanized and Galvalume stock each fear, why condensation and sealed wraps cause stain, the stock-age and film limits published by different makers, and how a colour is identified.

    You will be able to: Identify what damages each finish AFS handles, set the storage conditions that prevent it, and apply the supplier's age and film limits for the material in hand.

    Not startedStart →
  3. Lesson 3 · 12 min · 12 slides · 10 questions

    Coil handling and finish protection: methods and worked application

    A step-by-step method from receiving to shipping, the handling rules at each step, and a worked coil: weight per foot, length, PIW, outside diameter and pieces per coil.

    You will be able to: Apply a documented receiving-to-shipping method to an incoming coil, estimate its length, outside diameter and piece yield with every input stated, and set its inspection points.

    Not startedStart →
  4. Lesson 4 · 11 min · 12 slides · 9 questions

    Coil handling and finish protection: defects, verification and case study

    Seven finish defects and what to do about each, what touch-up paint can and cannot do, two fatal coil-handling cases, and the record that shows a coil was handled right.

    You will be able to: Identify a finish or handling defect from its mark, choose a corrective option within the supplier's and MCA's limits, and document the evidence a reviewer needs.

    Not startedStart →

Practical task

Build a documented coil handling and finish protection job packet for one incoming coil and one finish defect, so a reviewer can follow every decision without asking.

Hand in

  • A receiving and identification record: bands, wrap, edges, water, gauge, material, colour name and chart, finish face, with a photo list
  • A marked-up sketch of the coil (ID, OD, width, bands, finish face) and of where it will be stored, with chocks or rack, stack height and cover
  • The worked estimate for your coil: weight per foot, length, PIW, outside diameter and pieces per coil, with every input labelled as measured, supplier data, AFS register or assumption
  • A handling plan naming the equipment, its rated capacity (from AFS's equipment, not invented), who is trained to use it, and the supplier's age and film limits for the coil
  • A finish-defect analysis for one mark: what it is, its likely cause, touch-up or remake with the reason, and the evidence recorded

Rubric

CriterionMeets the standard when
IdentificationThe coil is matched by gauge, material, colour name and chart, and the finish face is stated.
CalculationsWeight per foot, length, PIW, OD and pieces are correct, with units and every input's source; the result is called an estimate.
StorageIndoors or covered with a breathing cover, off the ground, chocked or racked, stack height within the supplier's rule, first in, first out within the supplier's age limit.
SafetyForklift, sling or crane rules from 29 CFR 1910.178, .179 and .184 are applied, nobody goes under a raised load, and bands are cut so they cannot snap back.
Finish protectionContact points are padded, cutting is away from finished stock, and the film comes off when the supplier says.
Defect analysisThe touch-up or remake decision follows MCA and the supplier, and the record shows the product, batch and supplier consulted where touch-up is used.

Module quiz

10 questions drawn from a bank of 40; a new set each attempt. Pass mark 80%.

1. What is the eye of a coil?
2. What outside diameter does the worked-example coil have?
3. At AFS, what is ordered and fabricated?
4. What does mill passivation do to storage stain, according to GalvInfo?
5. What does PIW mean?
6. How far off the ground does GalvInfo keep galvanized sheet stored outdoors?
7. With a 58 degF dew point, how warm must the surface be for MCA's touch-up rule?
8. What does BlueScope say to do when packs become wet?
9. Where may no one stand or pass?
10. What does Sheffield Metals say never to do with a stack of coils?