Six steps of a documented comparison
1 Read the specification and list every attribute it names. 2 List the proposed product’s values with units. 3 Compare and mark each attribute. 4 Record assumptions and missing evidence. 5 Assemble the request. 6 Send it and wait for the decision.
This order is built from the University of Houston request contents and AFS's four statuses; neither source fixes a sequence.
A flow of a substitution request. 1 The contractor finds a need, a substitution for cause. 2 A written request with a comparison of significant qualities. 3 The architect checks the conditions: documents, schedule, warranty, compatibility, approvals; where a code alternative is involved the authority having jurisdiction approves. 4 The architect asks whether more information is needed; if yes the request returns to step 2. Then the architect decides: accepted by Change Order, Construction Change Directive or Architect’s Supplemental Instructions, or rejected, or no decision in time and the specified product is used.
- 1
- The contractor finds a need for a change
- 2
- A written request with a comparison of significant qualities
- 3
- The architect checks the conditions
- 4
- The architect asks whether more information is needed
Sources
- Section 01 25 00 Substitution Procedures, master specification (revision 01/29/2018) - University of Houston Master Construction Specifications (AIA-copyrighted master text)
- AFS specification-to-product comparison: Match, Differs, Not offered, Evidence missing - Architectural Flashing Supply