Turn a need into a performance requirement
A performance requirement needs five parts: the result, a criterion with a unit, a named test method, the evidence to submit, and who verifies it.
That five-part check is a teaching method for this course, not a quotation from a standard.
Seven boxes in a column joined by arrows: need, result stated, criterion with a unit, test method named, evidence required, who verifies, accept or reject. A side box on the test method step says that with no test method named the clause cannot be enforced.
Sources
- ANSI/SPRI/FM 4435/ES-1 Test Standard for Edge Systems Used with Low Slope Roofing Systems (approved November 21, 2022; free read-only copy) - SPRI (Single Ply Roofing Industry)
