Eight defects to look for
Eight defects to look for in flashing details: a butted coping, a cleat fixed tight, an untested substitute, a gauge without a metal, a dimension on the wrong element, an unrecorded unit, a drawing that disagrees with the specification, and a control layer that stops at the parapet.
Sources
- Roofing Detail: Coping-to-Wall Termination (February 3, 2011; composition credited to Wendy Zaremba-Just) - Building Enclosure (BNP Media)
- ANSI/SPRI ED-1 Design Standard for Edge Systems Used with Low Slope Roofing Systems, PROPOSED revision of October 2025 (not an approved edition) - SPRI
- ANSI/SPRI/FM 4435/ES-1 Test Standard for Edge Systems Used with Low Slope Roofing Systems (approved November 21, 2022) - SPRI
- FAR 52.236-21 Specifications and Drawings for Construction (FEB 1997) - General Services Administration (acquisition.gov)
- Insight 050: Parapets: Where Roofs Meet Walls (Joseph W. Lstiburek, June 2011, rev. 04/2012) - Building Science Corporation
- AFS CAD generator and CAD reader: how AFS writes and reads a flashing section in DXF - Architectural Flashing Supply