The four-layer pen test
This course's four-layer pen test traces each layer on the drawings without lifting the pen; a place where the pen must lift is a break.
BSC's parapet insight asks the designer to connect the water, air, vapor and thermal layers of the roof to the wall.
Seven steps follow: gather, trace four layers, mark transitions, record.
Seven steps in a column: gather the documents; trace the water, air, vapor and thermal lines, each with its line style; a decision box asking whether any line breaks, answered by flagging it for the designer of record; mark every transition and penetration; record the result.
- 1
- Gather the wall, roof and parapet details, the specified products and the code edition
- 2
- Trace the water line: membrane up the parapet, under the coping, to the wall
- 3
- Trace the air line: roof air layer to wall air layer, with no gap at the deck
- 4
- Trace the vapor line: one layer, on the side the climate calls for
- 5
- Trace the thermal line: roof insulation to wall insulation, marking interruptions
- 6
- Mark every transition and penetration and who details it
- 7
- Record pass or fail for each layer, the sources and the open questions
Sources
- Insight 050: Parapets - Where Roofs Meet Walls (June 2011, rev. 04/2012) - Building Science Corporation (Joseph Lstiburek)
