Trade terminology and component identification · Lesson 3 of 4

Trade terminology and component identification: methods and worked application

A naming method from place to order line, who supplies each part, the installation order of a cleat-and-cover edge from one maker's guide, and worked examples for girth, hems and piece counts.

You will be able to: Apply a written method to name every part of an assembly and say who supplies it, follow the order one maker's cleat-and-cover edge is installed in, and work through a drip edge, a hem and a run of pieces with every number sourced.

9 min · 10 slides · 6 questions

All lessons in this module
Slide 1 of 10

A naming method

Name a part in the same order every time: where it sits, the assembly, each part outside in, who supplies it, then material, legs and hems, and a read-back.

The flow chart shows each move, with a decision at who supplies the part and at any word with two meanings.

From a place on the building to an order line the shop can makeFlow chart: locate the part on the building, name the assembly, list the parts outside in, give each its trade name and AFS name, decide who supplies each part, record material, unit, finish and colour, record legs, hems, side, girth and length, stop at any word that means two things and write it out or ask, read the order back against the drawing, then send it.Where on the building?edge, parapet, wall, drainName the assemblyList the partsoutside inEach part: trade nameand AFS nameWho supplieseach part?AFS metalBy installer:membrane,strip, sealantMaterial, unit,finish, colour nameLegs, hems, side,girth, lengthAny word withtwo meanings?yesnoWrite it out,or ask inan RFIRead it back againstthe drawingSend the order

Flow chart: locate the part on the building, name the assembly, list the parts outside in, give each its trade name and AFS name, decide who supplies each part, record material, unit, finish and colour, record legs, hems, side, girth and length, stop at any word that means two things and write it out or ask, read the order back against the drawing, then send it.

The method in one flow. The two diamonds are the decisions: who supplies the part, and whether any word means two things.

Sources

Videos for this lesson

What this video shows: Sizing metal edge coping, materials, installation tools and the ANSI/SPRI ES-1 installation requirements for one manufacturer's snap-on coping, as its description states. Another maker's system; follow the guide for the system on the job.

Video: Metal Snap-On Coping; R-Mer Edge Coping -- Application Excellence by The Garland Company, Inc., on YouTube. Chosen from the video's published description.

Glossary

Cleat
In Drexel's Drip Edge guide, a galvanized continuous strip nailed along the roof edge; its kickout is the part the drip edge hooks onto.
Splice plate
In Drexel's Drip Edge guide, a 6 in plate placed at every joint between lengths.
Cover strip
In Drexel's Drip Edge guide, a 6 in strip over the roof flange of the drip edge, installed per the roofing manufacturer's instructions and supplied by the installer.
Miter
In Drexel's Drip Edge guide, the formed corner piece; the guide draws an outside corner.
Open hem allowance
The girth an open hem adds in AFS quoting: two fold-backs plus the gap, so 1.125 in for a 1/2 in fold-back and a 1/8 in gap.
Standard piece
The usual piece length AFS makes, 10 ft (120 in), as against the longest it can make, 126 in or 10 ft 6 in.