How to name the parts of a roof, a formed profile and an assembly, where sources use one word for different parts, and how to turn a field note into an order line the shop can make, with worked examples and a case study.

4 lessons · about 37 min · 21 diagrams · 5 videos

Version 1.0.0

Builds on these modules

Related Academy lessons

Lessons

0 of 4 complete

  1. Lesson 1 · 10 min · 12 slides · 6 questions

    Trade terminology and component identification: principles and terminology

    Roof geometry words, slope, the legs, girth, flange, kick and hems of a formed piece, where each AFS part sits on a building, and the safety words in OSHA's definitions.

    You will be able to: Name the parts of a roof, the parts of a formed piece of flashing and the places on a building where AFS parts go, define the key terms, and recognise the words that carry a safety meaning.

    Not startedStart →
  2. Lesson 2 · 10 min · 12 slides · 6 questions

    Trade terminology and component identification: materials, standards and design constraints

    Where definitions come from, the split meanings of reglet, cap flashing, clip, fascia, drip edge, cricket and saddle, the catalog's material names, and the standard and maximum sizes.

    You will be able to: Say which document defines a word, explain the words that mean two things in different sources, and treat material names and sizes as part of the vocabulary an order depends on.

    Not startedStart →
  3. Lesson 3 · 9 min · 10 slides · 6 questions

    Trade terminology and component identification: methods and worked application

    A naming method from place to order line, who supplies each part, the installation order of a cleat-and-cover edge from one maker's guide, and worked examples for girth, hems and piece counts.

    You will be able to: Apply a written method to name every part of an assembly and say who supplies it, follow the order one maker's cleat-and-cover edge is installed in, and work through a drip edge, a hem and a run of pieces with every number sourced.

    Not startedStart →
  4. Lesson 4 · 8 min · 10 slides · 6 questions

    Trade terminology and component identification: defects, verification and case study

    Word defects (reglet, base flashing, cap and kick, hemmed, galv, fascia, lengths and joints), the hand-protection rule for cut edges, a worked field note, and a read-back check.

    You will be able to: Diagnose a wrong or two-way word on an order, say what the correction is, and verify an order line by reading it back against the drawing, using a worked field note as the case study.

    Not startedStart →

Practical task

Produce a naming packet for one real or drawn building edge that has a roof edge or parapet and a wall or drain: a marked-up sketch, a list of every part with its trade name, its AFS name and who supplies it, a written order line for each AFS part, and a list of every word you had to resolve.

Hand in

  • A sketch or marked-up photo of the edge with each part given a letter and a legend that names it with the source of the word (NRCA, AFS or a maker's guide)
  • A table of the parts, outside in, with trade name, AFS name, supplier (AFS metal or by installer) and, for each AFS part, the material and unit, the legs and hems with their side, and the girth worked out and checked against the 48 in widest blank
  • A length plan for one straight run: the run in inches, the piece length used (10 ft standard or the 10 ft 6 in maximum), the number of pieces and joints, with the arithmetic shown
  • A list of every word with two meanings that you met (for example reglet, cap, kick, hemmed, galv, fascia), the question you would ask and the written-out replacement
  • A completed read-back of the order against the drawing, marking each name as from the drawing, from the catalog or still a question

Rubric

CriterionMeets the standard when
Names and sourcesEvery part has a trade name and an AFS name, each word names its source, and where two sources disagree the packet says so and picks one in writing.
SupplierEach part is marked AFS metal or by installer, and membrane, strip and sealant items are not written as AFS parts.
Profile factsLegs are lettered in drawing order and measured to the sharp corner, each hem has a type, fold-back and side, and girth is the legs plus hem allowances with the 48 in limit checked.
ArithmeticThe run is converted to inches, the pieces and joints are counted with the stated piece length, and no piece exceeds the 126 in maximum.
AmbiguityEach two-way word is listed with a question and a written-out replacement, and the read-back leaves no name untraced.

Module quiz

10 questions drawn from a bank of 24; a new set each attempt. Pass mark 80%.

1. How does the NRCA glossary define a reglet?
2. In AFS usage, what is girth?
3. How many senses does NRCA's glossary give cap flashing?
4. What gap does Drexel's guide leave between lengths of drip edge for thermal expansion?
5. What does Drexel's Drip Edge guide install first?
6. Under 29 CFR 1910.138, when must employers require hand protection?
7. For a kick, what should the order give?
8. In the example field note, which word is written out as Galvanized Steel or Galvalume?
9. What is the longest piece AFS can make?
10. What does NRCA say membrane base flashing is made of?