The common ways a shop loses metal or time, how to check a plan against what the shop really pulled, a worked case on a wide profile, and the evidence packet a reviewer needs.

You will be able to: Diagnose a yield or throughput defect from evidence, compare planned with actual sheets, utilization and first-pass yield, explain corrective options and who decides them, and assemble the evidence for review.

9 min · 11 slides · 6 questions

All lessons in this module
Slide 1 of 11

Yield defects to look for

A width just past a breakpoint. Short pieces cut one per strip. Lengths that add up to exactly 10 ft with no cut allowance. Pieces remade after a miscut or misfold. Drops of mixed metals. Jobs piling up between stages.

Each has a different fix and a different owner.

Glossary

Planned versus actual
Comparing the sheets, utilization and first-pass yield a plan predicted with what the shop really pulled and made, and recording why they differ.
Remnant
A usable drop kept for a later job of the same metal and thickness. Under 29 CFR 1910.176(b) its storage must not create a hazard, and if stored in tiers it must be stacked, blocked, interlocked and limited in height so it is stable and secure.
Defect (lean waste)
One of the seven deadly wastes EPA lists: making a defective part consumes raw materials and energy, which then need recycling or disposal.