Five words that overlap in daily use, the three parts of every finding, what a non-conformance report is, the difference between quality control and quality assurance, who the expert is, and what any inspection cannot tell you.

You will be able to: Define audit, inspection, observation, investigation and commissioning, name criteria, evidence, finding and non-conformance report, say who counts as an expert, and state the safety boundaries.

12 min · 12 slides · 9 questions

All lessons in this module
Slide 1 of 12

Who does the checking

AFS fabricates flashing; it does not inspect buildings, run field water tests or give expert opinions on a roof.

This module is for the people who check: shop staff comparing parts and orders with written criteria, crews and foremen inspecting installed work, and architects and consultants who observe and report.

Glossary

Audit
In this module, a planned comparison of records, parts or installed work against written criteria, with the findings documented. This is the module's working definition, built from NIBS Guideline 3 and UFC 3-110-03.
Audit criteria
The written requirements the work is compared with, such as the contract documents, the manufacturer's instructions or the owner's requirements.
Non-conformance report
A report generated when materials or systems do not comply with approved requirements, making quality unacceptable or indeterminate (NIBS Guideline 3).
Quality assurance
The determination that the designer and contractor followed established quality control guidelines (UFC 3-110-03).
Independent peer review
A review by a specialist with no relationship to any firm providing services to the project and no known conflict of interest (NIBS Guideline 3).
Building Enclosure Specialist
In NIBS Guideline 3, the party deemed an expert in the building enclosure systems, with the experience to design, critique, validate and support the team.