The seven-step packet
The method taught here has seven steps, and each leaves a record:
- collect every document, with edition and date
- extract each requirement into one row
- classify each row: agrees, conflicts or gap
- find the contract's own precedence clause
- test against what the shop can make
- write the query or the variation
- record the decision and its evidence
Flow chart: spot a difference or a gap, classify it, collect every document with edition and date, ask whether the contract clause ranks the two (yes: follow it), check code editions and standards, check what AFS can make, ask whether it is ours to decide (yes: decide and record), otherwise write a query to the party the contract names, mark any variation with a side-by-side comparison, take the reviewer's answer, and ask whether it is approved or approved as noted (no: back to the query), then record it and fabricate.
Sources
- FAR 52.236-21 Specifications and Drawings for Construction - Federal Acquisition Regulation (acquisition.gov)
- UFGS 01 33 00 Submittal Procedures (August 2026) - U.S. Department of Defense, Unified Facilities Guide Specifications (Whole Building Design Guide)
- AFS Spec Match: what a specification asks for compared with what AFS offers (Match, Differs, Not offered, Evidence missing) - Architectural Flashing Supply