Architectural Flashing Supply
Start a Quote
Production workflow and shop travelers · Lesson 3 of 4

Production workflow and shop travelers: methods and worked application

A step-by-step method for a traveler, worked through on a coping order: girth gate, piece count, blanks per sheet, the material line, hold points and the measurements to record.

You will be able to: Build a job traveler for a realistic order: check it against the limits, count the pieces, record assumptions and units, and set its hold and inspection points.

8 min · 10 slides · 6 questions

All lessons in this module
Slide 1 of 10

A method in six steps

For every job:

  • Identify it: customer, job name or number, item and quantity
  • State the material line
  • Check the profile against the limits and read its status
  • Count the pieces for the run
  • Set the hold points and who signs them
  • List what is measured and recorded

Sources

Glossary

Mold line
The theoretical sharp corner of a bend; AFS measures every leg to it.
Blank
The flat piece cut to the girth before it is formed.
Load constant
In the NIOSH lifting equation, the 51 lb limit for ideal conditions; task multipliers lower it for real lifts.
Lifting index
NIOSH's relative estimate of the physical stress of a lifting task.