The inspection sequence
Work in the same order every time:
- Read the order
- Confirm material, gauge and finish
- Zero the tools
- Thickness, in three places
- Each leg, to the mold line
- Each angle and its direction
- Hems: end, face, return, gap
- Blank Width
- Painted side
- Length and piece count
- Flatness and surface
- Record and initial
Twelve numbered steps in a column, from reading the order to recording and initialling. Beside them, the loop after each check: in band, go on to the next check; out of band, re-zero and re-measure; back in band, go on to the next check; still out, hold the piece and flag it. Both pass branches end on a Next check terminal, not on a particular step.
- 1
- Read the order
- 2
- Confirm material, gauge and finish
- 3
- Zero every tool (Mitutoyo guidance)
- 4
- Thickness, in three places
- 5
- Each leg, to the mold line
- 6
- Each bend angle and its direction
- 7
- Hems: end, face, return and gap
- 8
- Blank Width
- 9
- Painted side
- 10
- Length (120 in standard, 126 in max) and piece count
- 11
- Flatness and surface
- 12
- Record each reading with its tool and zero check, and initial
Sources
- FlashDraft to the AFS Thalmann folder (via PathfinderEdge): legs, bend angles and blank width; painted side and 3D confirmation - Architectural Flashing Supply
- Quick Guide to Precision Measuring Instruments, catalog E11003(7) - Mitutoyo
- AFS fabrication limits - materials, thicknesses, bend rules and sizes the shop can make - Architectural Flashing Supply