Start with scope and neighbors
Start with the scope: which edges are in the job, which of them belong to 07 62 00 and which to 07 71 00 or a wall section.
Write that down first, because every later step depends on it.
Through-wall flashing and manufactured specialties belong in other sections.
Sources
- MasterFormat Numbers and Titles, April 2016 - Construction Specifications Institute and Construction Specifications Canada (copy hosted by Vermont Buildings and General Services)
- UFGS-07 60 00 Flashing and Sheet Metal (August 2023, Change 1 05/25; a US federal guide specification) - USACE / NAVFAC / AFCEC, Unified Facilities Guide Specifications (hosted by the National Institute of Building Sciences)
