The nine-step method
Nine steps: register, collect, field-measure, draw, check, flag deviations, transmit, track, resubmit.
Each step leaves a record: the register line, the data and samples, the field note, the drawing revision, the contractor stamp, the encircled deviation, the transmittal, the log entry and the revision suffix.
The method is a way of working, not a standard; your specification sets the details.
Nine steps, each with the record it leaves: register (register line), collect (data and samples), field-measure (field note), draw (drawing revision), check (contractor stamp), flag deviations (encircled deviation), transmit (transmittal), track (log entry) and resubmit (revision suffix).
Sources
- UFGS 01 33 00 Submittal Procedures (August 2026, 36 pages), Part 1 General - U.S. Army Corps of Engineers, NAVFAC and AFCEC (Unified Facilities Guide Specifications), via the Whole Building Design Guide
- Section 013300 Submittal Procedures, one college project specification (East Central College, Hansen Hall Level 300/400 Renovations) - East Central College (project specification)