Ways a submittal comes back
A college specification returns without review a submittal lacking the contractor's approval stamp, or one from a source other than the contractor.
It also says a partial submittal is nonresponsive and returned without review.
Two panels. A package that comes back: no contractor stamp, not sent by the contractor, a deviation not flagged, only half the set, related items sent separately. A package that goes through: stamped, signed and dated, sent by the contractor, the deviation encircled and listed, related items sent together, complete with nothing missing.
Sources
- Section 013300 Submittal Procedures, one college project specification (East Central College, Hansen Hall Level 300/400 Renovations) - East Central College (project specification)