CSI MasterFormat and Division 07 · Lesson 4 of 4

CSI MasterFormat and Division 07: defects, verification and case study

Real defects found in public flashing sections, how to check a submittal and the work against a section, a constructed ES-1 coping case, and how to write the question and keep the evidence.

You will be able to: Diagnose gaps, overlaps, conflicting numbers and edition drift in a flashing specification, verify a submittal and the finished work against the section, and write the question and the record.

10 min · 10 slides · 8 questions

All lessons in this module
Slide 1 of 10

Where specifications fail

Five patterns recur: a gap (nothing covers an item), an overlap (two sections cover it), two numbers that disagree, a cited edition that has moved on, and a pointer to a section that is not there.

The next slides show each in the public sections used here.

Sources

Glossary

Scope gap
An item that no section in the project manual covers, or a pointer such as 07 71 00 to a section that is not listed. A bidder raises it as a question.
Overlap
The same item specified in two sections with different requirements. The fabricated or manufactured split in the master list is meant to give each item one home.
Edition drift
Two documents citing different editions of the same standard, as UFGS cites ES-1 (2017) and VA cites ES-1-03, so the requirements cited may differ.
Request for information (RFI)
A written question to the design team that names the section and paragraph in doubt, the readings seen and the assumption proposed.
Evidence trail
The documents that prove a requirement was met, such as SRP's product certificates and ICC-ES evaluation reports for ES-1 tested copings.