Two numbers: demand and tested resistance
Demand is the pressure the wind asks of the edge; tested resistance is what a test record says an assembly held.
IIBEC describes two steps: determine the design wind loads for each edge condition, then select flashings whose tested resistance equals or exceeds them.
A trade article names four drivers of design pressure: wind speed, building height, location and building use.
Sources
- Understanding ES-1: Proper Specification and Implementation - IIBEC
- Roofing on the edge (October 2018) - Professional Roofing (NRCA)
