A continuity check in eight steps
Run the check on the drawings before the wall is built:
- Name the code edition and referenced standards
- Trace the water control layer on every elevation and section
- List each interruption
- Name the piece that hands water out
- Check lap direction and sequence
- Check the ends
- Check the exit: weeps and drip
- Check the metal; then write the continuity schedule
A vertical flow of eight steps in four phases: name the code edition and trace the water control layer; list every interruption and name the piece that hands water out; check laps and sequence, the ends, and weeps, drip and metal; then write the continuity schedule.