A transition schedule
Hutchinson advises drawing in each layer of insulation and its attachment method.
A transition schedule lists, for each transition, the layers on both sides, the piece that joins them, the datum, the measured height, the governing document and the trade.
This is a working method, not a code requirement; it makes every number name its source and its datum.