Roof, wall and foundation transitions · Lesson 4 of 4

Roof, wall and foundation transitions: defects, verification and case study

The defects that recur at roof-to-wall, coping-to-wall, eave-to-sidewall and wall-base transitions, what to inspect and record, and a fictional clinic case study that finds three of them and writes the corrections.

You will be able to: Diagnose the recurring transition defects, from a reroof that outgrows its receiver to a screed buried by landscaping, say what evidence verifies each, and work a fictional case study into a corrected schedule and a request-for-information log.

10 min · 12 slides · 6 questions

All lessons in this module
Slide 1 of 12

A reroof outgrows the receiver

Hutchinson says that for a reroof, test cuts of the existing roof system should be taken so its composition and depth are known.

Hutchinson lists two options when insulation rises above existing through-wall flashing: raise the through-wall flashing, or design an interior gutter and leave the existing flashing in place.

Both are designer decisions, made from the test cuts.

Glossary

Test cut
A small opening cut in an existing roof so its layers and their depth can be seen before new flashing heights are set; Hutchinson says to take them at a reroof.
Saddle flashing
A formed piece set in sealant at the junction where a coping meets a taller wall, used with wall flashing and counterflashing so the coping is not simply butted to the wall (Building Enclosure, 2011).
Request for information (RFI)
A written question sent to the designer of record about a condition that the drawings do not settle; here each transition defect becomes one, with measured values and datums attached.
Incompatible membranes
Roof and wall membranes that cannot be placed in contact; ABAA gives a separate detail family for connecting them.