Architectural Flashing Supply
Start a Quote
Corrosion, galvanic action and service life · Lesson 3 of 4

Corrosion, galvanic action and service life: methods and worked application

An eight-step review method; screening pairs with the Design Center and reading it against the sources; choosing separation; zinc-loss arithmetic, an area-ratio example and a site checked against four warranty and category documents.

You will be able to: Run a documented corrosion and service-life review on a flashing detail: define the site, map contact and drainage paths, screen pairs, choose separation, check warranties and record assumptions, with three worked examples.

12 min · 11 slides · 8 questions

All lessons in this module
Slide 1 of 11

A documented review in eight steps

This course's review has eight steps: define the site, list the metals, map the contact and drainage paths, screen the pairs, choose separation, check each warranty, record the assumptions, and send requests for information.

It is a teaching method built from the sources in these lessons, not a published standard.

An eight-step corrosion and service-life reviewEight numbered boxes read left to right and down: define the site, list the metals, map the paths, screen the pairs, choose separation, check warranties, record assumptions, and send requests for information. A note says AFS fabricates to the specification and does not predict or warrant service life.1Definethe site2Listthe metals3Mapthe paths4Screenthe pairs5Chooseseparation6Checkwarranties7Recordassumptions8SendrequestsAFS fabricates to the specification.It does not predict or warrant service life.

Eight numbered boxes read left to right and down: define the site, list the metals, map the paths, screen the pairs, choose separation, check warranties, record assumptions, and send requests. A note says AFS fabricates to the specification and does not predict or warrant service life.

1
Define the site: exposure evidence, the distance to salt water measured on the plan, and local electrolyte sources
2
List the metals: every metal, coating, fastener and substrate in the detail
3
Map the paths: where parts touch or share a fastener, and where water runs from one part onto another
4
Screen the pairs: avoid, caution, compatible, review or not covered, noting which part is small
5
Choose separation: insulate, coat the more noble part, place the joint out of the damp, or drain runoff away
6
Check warranties: each product's distance condition and exclusions, with the document's date
7
Record assumptions: service-life assumptions as the designer's own, each with its source
8
Send requests for information for every fact the record lacks
This course's review method, built from the sources in these lessons. It is a teaching sequence, not a published standard.

Glossary

Contact path
A place where two metals touch or share a fastener, giving the electrical connection a galvanic couple needs.
Drainage path
The route water takes from one part onto another; copper-bearing water running onto aluminum or zinc can corrode it with no contact at all.
Screening
A first look at a metal pair that returns avoid, caution, compatible, review or not covered; it is not an approval and does not replace the maker's guidance.
Separation
Breaking the metal path or keeping moisture off: insulating the parts, coating the more noble part (never only the anode), placing the joint out of the damp, or draining runoff away.
Request for information
A written question for the designer or maker about a fact the record lacks, such as a stainless grade or aluminum alloy that AFS marks "AFS to confirm".