From spec line to screened order
Eight steps take a specification line to an order that can be fabricated. The flow shows where a request for information (RFI) is raised.
The AFS Design Center screens pairs of metals qualitatively from the MCA bulletin, never as a binary approval.
A pair the source does not cover comes back as not covered, with the instruction to ask AFS.
A vertical flow of eight steps: read the spec line, match it to the AFS material, list every contact and drain-onto material, screen each pair, a decision that raises an RFI with a separation note, storage and handling notes, a decision that raises an RFI to AFS, and read back the order line and file the packet.
- 1
- Read the spec line: metal, standard, weight or temper, finish, chart name
- 2
- Match to the AFS material and its thickness unit
- 3
- List every contact and drain-onto material
- 4
- Screen each pair
- 5
- Request for information and separation note
- 6
- Storage and handling notes
- 7
- Request for information to AFS
- 8
- Read back the order line and file the packet
Sources
- Design Center thermal movement and metal compatibility tool (qualitative screening from the MCA bulletin) - Architectural Flashing Supply
