The diagram is a teaching order, not an AFS procedure. First, count what arrived against the order paperwork.
The Aluminum Association says damage on skids, packaging or metal should be noted on the receiving papers, and a torn package with significant water treated as suspect.
TR-3 says if metal feels cold, tell your supervisor and let it warm up slowly in a cool area away from drafts.
Flow chart in a teaching order: delivery arrives, count against the order, a decision on damaged or wet with a yes branch to a stop-and-report box, warm cold metal slowly, identify and tag, store raised tilted and dry, issue oldest stock first, handle without dragging, fabricate, check against the order at the AFS stage called Quality Check, then pack and ship.