The method, start to finish
Read the spec: metal, standard, temper or grade, finish and thickness. Map it to AFS's material list, screen every contact and drainage path, set the shop up for the metal, fabricate within AFS limits, inspect, pack dry and record.
The compatibility screening is a check, not an approval: the designer decides.
Flow chart: read the spec, map to AFS limits, screen contact and runoff, then set up the shop by metal (stainless clean and segregated, copper gloves, zinc metal temperature check with a warm-or-wait loop), fabricate within AFS limits, inspect, pack dry and ventilated, and record.
- 1
- Read the spec: metal, standard, temper or grade, finish, thickness
- 2
- Map it to the AFS material and its bend rule
- 3
- Screen every contact and drainage path; conflicts go to the designer
- 4
- Set up the shop for the metal
- 5
- Fabricate within AFS limits
- 6
- Inspect against the metal's card
- 7
- Pack dry and ventilated, never tarped on bare ground, and record
Sources
- UFGS 07 60 00 Flashing and Sheet Metal (Unified Facilities Guide Specifications, August 2023, Change 1 05/25) - USACE / NAVFAC / AFCEC (Whole Building Design Guide)
- AFS fabrication limits - materials, thicknesses, bend rules and sizes the shop can make - Architectural Flashing Supply
- AFS Design Center Thermal Movement and Compatibility tool: dissimilar-metal screening - Architectural Flashing Supply